| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 33.17 | 24.92 | 58.09 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATIN OF SOUND AND COMMUNICATION SYSTEMS) | 30.05 | 12.01 | 42.06 |
| ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND VETERANS DAY | 51.93 | 38.44 | 90.37 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | 32.35 | 13.10 | 45.45 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | 32.85 | 13.10 | 45.95 |
| IRONWORKER: ORNAMENTAL | 28.26 | 8.13 | 36.39 |
| PIPEFITTER | 39.76 | 14.04 | 53.80 |
| TRUCK DRIVER: WATER TRUCK | 12.00 | 4.11 | 16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: FLATBED TRUCK | 19.65 | 8.57 | 28.22 |
| TRUCK DRIVER: DUMP TRUCK | 12.39 | 1.18 | 13.57 |
| TILE SETTER | 14.74 | — | 14.74 |
| TILE FINISHER | 11.22 | — | 11.22 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.44 1.46 SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 22.73 | 7.52 | 30.25 |
| ROOFER | 13.75 | — | 13.75 |
| PLUMBER | 21.35 | 4.55 | 25.90 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 14.45 | — | 14.45 |
| OPERATOR: ROLLER | 12.70 | — | 12.70 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.03 | — | 16.03 |
| OPERATOR: MECHANIC | 17.52 | 3.33 | 20.85 |
| OPERATOR: LOADER | 12.62 | 2.42 | 15.04 |
| OPERATOR: GRADER/BLADE | 15.10 | 1.94 | 17.04 |
| OPERATOR: FORKLIFT | 14.83 | — | 14.83 |
| OPERATOR: DRILL | 16.22 | 0.34 | 16.56 |
| OPERATOR: BULLDOZER | 14.00 | 0.27 | 14.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.93 | — | 13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 15.60 | — | 15.60 |
| LABORER: ROOF TEAROFF | 11.28 | — | 11.28 |
| LABORER: PIPELAYER | 12.49 | 2.13 | 14.62 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.66 | — | 10.66 |
| LABORER: MASON TENDER - BRICK | 11.36 | — | 11.36 |
| LABORER: COMMON OR GENERAL | 11.02 | — | 11.02 |
| IRONWORKER, STRUCTURAL | 20.00 | — | 20.00 |
| IRONWORKER, REINFORCING | 12.27 | — | 12.27 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 19.77 | 7.13 | 26.90 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 14.36 | 2.44 | 16.80 |
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) | 14.00 | 2.90 | 16.90 |
| CEMENT MASON/CONCRETE FINISHER | 13.94 | — | 13.94 |
| CARPENTER, EXCLUDES FORM WORK | 25.00 | — | 25.00 |
| CARPENTER (FORM WORK ONLY) | 13.63 | — | 13.63 |
| BRICKLAYER | 18.33 | 2.50 | 20.83 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | 7.25 | — | 7.25 |
| TILE SETTER | 7.25 | — | 7.25 |
| SHEET METAL WORKER | 8.00 | — | 8.00 |
| ROOFER | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: DOZERS | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: (TRACTORS) | 7.25 | — | 7.25 |
| POWER EQUIPMENT OPERATORS: (LOADERS) | 7.25 | — | 7.25 |
| PLUMBERS AND PIPEFITTERS | 7.88 | — | 7.88 |
| PLASTERER | 13.10 | — | 13.10 |
| PAINTERS: SPRAY | 8.00 | — | 8.00 |
| PAINTERS: BRUSH | 7.25 | — | 7.25 |
| PAINTERS: (TAPE & BED) | 8.00 | — | 8.00 |
| LABORERS: UNSKILLED | 7.25 | — | 7.25 |
| LABORERS: PLASTERERS' TENDERS | 7.85 | — | 7.85 |
| LABORERS: MASON TENDERS | 7.25 | — | 7.25 |
| LABORERS: (MORTAR MIXERS) | 7.25 | — | 7.25 |
| IRONWORKER | 7.25 | — | 7.25 |
| INSULATOR | 7.25 | — | 7.25 |
| FLOOR LAYER: CARPET | 8.83 | — | 8.83 |
| ELECTRICIAN | 8.50 | — | 8.50 |
| DRYWALL HANGER | 7.25 | — | 7.25 |
| CEMENT MASON/CONCRETE FINISHER | 7.53 | — | 7.53 |
| CARPENTER | 8.00 | — | 8.00 |
| BRICKLAYER | 12.00 | — | 12.00 |
| AIR CONDITIONING MECHANIC | 7.25 | — | 7.25 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| WORK ZONE BARRICADE SERVICER | 16.80 | — | 16.80 |
| TRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER.$ 20.66 0.00 TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK | 21.94 | — | 21.94 |
| TRUCK DRIVER, SINGLE AXLE | 19.19 | — | 19.19 |
| TRUCK DRIVER LOWBOY FLOAT | 23.18 | — | 23.18 |
| SPREADER BOX OPERATOR | 19.28 | — | 19.28 |
| ROLLER OPERATOR, OTHER | 16.80 | — | 16.80 |
| ROLLER OPERATOR, ASPHALT | 18.35 | — | 18.35 |
| REINFORCING STEEL WORKER | 24.99 | — | 24.99 |
| PAVEMENT MARKING MACHINE OPERATOR | 16.80 | — | 16.80 |
| MOTOR GRADER OPERATOR, ROUGH | 19.00 | — | 19.00 |
| MOTOR GRADER OPERATOR, FINE GRADE | 23.01 | — | 23.01 |
| MILLING MACHINE OPERATOR | 19.48 | — | 19.48 |
| MECHANIC | 25.11 | — | 25.11 |
| LOADER/BACKHOE OPERATOR | 20.20 | — | 20.20 |
| LABORER, UTILITY | 17.91 | — | 17.91 |
| LABORER, COMMON | 16.80 | — | 16.80 |
| FRONT END LOADER OPERATOR, OVER 3 CY | 17.25 | — | 17.25 |
| FRONT END LOADER OPERATOR, 3 CY OR LESS | 18.40 | — | 18.40 |
| FORM SETTER, PAVING & CURB | 18.50 | — | 18.50 |
| FORM BUILDER/SETTER, STRUCTURES | 19.31 | — | 19.31 |
| FLAGGER | 15.30 | — | 15.30 |
| EXCAVATOR OPERATOR, OVER 50,000 POUNDS | 20.36 | — | 20.36 |
| CRAWLER TRACTOR OPERATOR | 20.00 | — | 20.00 |
| CRANE OPERATOR, LATTICE BOOM 80 TONS OR LESS | 25.57 | — | 25.57 |
| CONCRETE SAW OPERATOR | 20.69 | — | 20.69 |
| CONCRETE PAVEMENT FINISHING MACHINE OPERATOR | 24.85 | — | 24.85 |
| CONCRETE FINISHER, PAVING AND STRUCTURES | 21.11 | — | 21.11 |
| BROOM OR SWEEPER OPERATOR | 17.75 | — | 17.75 |
| ASPHALT RAKER | 18.76 | — | 18.76 |
| ASPHALT PAVING MACHINE OPERATOR | 20.95 | — | 20.95 |
| ASPHALT DISTRIBUTOR OPERATOR | 23.09 | — | 23.09 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: TANDEM AXLE TRACTOR W/SEMI TRAILER | 12.50 | — | 12.50 |
| TRUCK DRIVER: OFF-ROAD HAULER | 10.08 | — | 10.08 |
| TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP) | 11.95 | — | 11.95 |
| TRUCK DRIVER (SINGLE AXLE) | 10.75 | — | 10.75 |
| TRUCK DRIVER (LOWBOY-FLOAT) | 13.41 | — | 13.41 |
| STEEL WORKER (REINFORCING) | 17.53 | — | 17.53 |
| SERVICER | 14.11 | — | 14.11 |
| POWER EQUIPMENT OPERATOR: SCRAPER | 10.85 | — | 10.85 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, ROUGH | 15.83 | — | 15.83 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE | 16.88 | — | 16.88 |
| POWER EQUIPMENT OPERATOR: MECHANIC | 17.47 | — | 17.47 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS | 13.40 | — | 13.40 |
| POWER EQUIPMENT OPERATOR: FRONT END LOADER , OVER 3 CY | 12.33 | — | 12.33 |
| POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED | 22.05 | — | 22.05 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR OPERATOR OVER 50,000 POUNDS | 13.52 | — | 13.52 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR 50,000 POUNDS OR LESS | 13.67 | — | 13.67 |
| POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR | 13.62 | — | 13.62 |
| POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER | 10.08 | — | 10.08 |
| POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR | 13.88 | — | 13.88 |
| POWER EQUIPMENT OPERATOR: (SPREADER BOX) | 13.12 | — | 13.12 |
| POWER EQUIPMENT OPERATOR: (ROLLER, OTHER) | 10.44 | — | 10.44 |
| POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT) | 11.96 | — | 11.96 |
| POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE) | 13.10 | — | 13.10 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | 12.22 | — | 12.22 |
| POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE) | 12.97 | — | 12.97 |
| POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS) | 13.85 | — | 13.85 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | 12.35 | — | 12.35 |
| LABORER: PIPELAYER | 14.64 | — | 14.64 |
| LABORER: ASPHALT RAKER | 12.02 | — | 12.02 |
| LABORER (WORK ZONE BARRICADE SERVICER) | 11.46 | — | 11.46 |
| LABORER (LABORER, UTILITY) | 12.70 | — | 12.70 |
| LABORER (LABORER, COMMON) | 10.08 | — | 10.08 |
| LABORER (FLAGGER) | 8.50 | — | 8.50 |
| FORM BUILDER/FORM SETTER (STRUCTURES) | 13.38 | — | 13.38 |
| FORM BUILDER/FORM SETTER (PAVING & CURB) | 13.93 | — | 13.93 |
| ELECTRICIAN | 19.87 | — | 19.87 |
| CEMENT MASON/CONCRETE FINISHER (PAVING AND STRUCTURES) | 13.16 | — | 13.16 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| WORK ZONE BARRICADE SERVICER | 7.85 | — | 7.85 |
| TRUCK DRIVER, TANDEM AXLE, SEMI-TRAILER | 10.51 | — | 10.51 |
| TRUCK DRIVER, SINGLE AXLE, LIGHT | 9.62 | — | 9.62 |
| TRUCK DRIVER, SINGLE AXLE, HEAVY | 13.13 | — | 13.13 |
| TRUCK DRIVER, LOWBOY-FLOAT | 10.50 | — | 10.50 |
| TRAVELING MIXER OPERATOR | 10.05 | — | 10.05 |
| TRACTOR OPERATOR, PNEUMATIC | 11.00 | — | 11.00 |
| SPREADER BOX OPERATOR | 13.12 | — | 13.12 |
| SERVICER | 10.00 | — | 10.00 |
| SCRAPER OPERATOR | 9.50 | — | 9.50 |
| ROLLER OPERATOR, STEEL WHEEL, PLANT MIX PAVEMENT | 9.75 | — | 9.75 |
| ROLLER OPERATOR, STEEL WHEEL, FLAT WHEEL/TAMPING | 9.23 | — | 9.23 |
| ROLLER OPERATOR, PNEUMATIC, SELF-PROPELLED | 8.39 | — | 8.39 |
| REINFORCING STEEL SETTER | 12.52 | — | 12.52 |
| PAVEMENT MARKING MACHINE OPERATOR | 10.56 | — | 10.56 |
| MOTOR GRADER OPERATOR ROUGH | 13.34 | — | 13.34 |
| MOTOR GRADER OPERATOR FINE GRADE | 13.35 | — | 13.35 |
| MECHANIC (UNDEFINED) | 13.53 | — | 13.53 |
| LABORER, UTILITY | 11.39 | — | 11.39 |
| LABORER, COMMON | 8.86 | — | 8.86 |
| FRONT END LOADER OPERATOR | 10.78 | — | 10.78 |
| FORM BUILDER/SETTER, STRUCTURES | 9.57 | — | 9.57 |
| FLAGGER | 7.61 | — | 7.61 |
| ELECTRICIAN | 15.00 | — | 15.00 |
| CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL OPERATOR | 12.14 | — | 12.14 |
| CONCRETE PAVING SAW OPERATOR | 12.13 | — | 12.13 |
| CONCRETE FINISHER, STRUCTURES | 10.40 | — | 10.40 |
| CONCRETE FINISHER, PAVING | 12.46 | — | 12.46 |
| CARPENTER | 12.59 | — | 12.59 |
| BULLDOZER OPERATOR | 11.97 | — | 11.97 |
| BROOM OR SWEEPER OPERATOR | 8.47 | — | 8.47 |
| ASPHALT SHOVELER | 8.00 | — | 8.00 |
| ASPHALT RAKER | 8.58 | — | 8.58 |
| ASPHALT PAVING MACHINE OPERATOR | 10.49 | — | 10.49 |
| ASPHALT DISTRIBUTOR OPERATOR | 11.74 | — | 11.74 |