Building Published 05/18/2026. 41 classifications. Covers 1 county: Gregg
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 33.17 | 24.92 | 58.09 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATIN OF SOUND AND COMMUNICATION SYSTEMS) | 30.05 | 12.01 | 42.06 |
| ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND VETERANS DAY | 51.93 | 38.44 | 90.37 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | 32.35 | 13.10 | 45.45 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | 32.85 | 13.10 | 45.95 |
| IRONWORKER: ORNAMENTAL | 28.26 | 8.13 | 36.39 |
| PIPEFITTER | 39.76 | 14.04 | 53.80 |
| TRUCK DRIVER: WATER TRUCK | 12.00 | 4.11 | 16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: FLATBED TRUCK | 19.65 | 8.57 | 28.22 |
| TRUCK DRIVER: DUMP TRUCK | 12.39 | 1.18 | 13.57 |
| TILE SETTER | 14.74 | — | 14.74 |
| TILE FINISHER | 11.22 | — | 11.22 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.44 1.46 SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 22.73 | 7.52 | 30.25 |
| ROOFER | 13.75 | — | 13.75 |
| PLUMBER | 21.35 | 4.55 | 25.90 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 14.45 | — | 14.45 |
| OPERATOR: ROLLER | 12.70 | — | 12.70 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.03 | — | 16.03 |
| OPERATOR: MECHANIC | 17.52 | 3.33 | 20.85 |
| OPERATOR: LOADER | 12.62 | 2.42 | 15.04 |
| OPERATOR: GRADER/BLADE | 15.10 | 1.94 | 17.04 |
| OPERATOR: FORKLIFT | 14.83 | — | 14.83 |
| OPERATOR: DRILL | 16.22 | 0.34 | 16.56 |
| OPERATOR: BULLDOZER | 14.00 | 0.27 | 14.27 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.93 | — | 13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 15.60 | — | 15.60 |
| LABORER: ROOF TEAROFF | 11.28 | — | 11.28 |
| LABORER: PIPELAYER | 12.49 | 2.13 | 14.62 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.66 | — | 10.66 |
| LABORER: MASON TENDER - BRICK | 11.36 | — | 11.36 |
| LABORER: COMMON OR GENERAL | 11.02 | — | 11.02 |
| IRONWORKER, STRUCTURAL | 20.00 | — | 20.00 |
| IRONWORKER, REINFORCING | 12.27 | — | 12.27 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 19.77 | 7.13 | 26.90 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 14.36 | 2.44 | 16.80 |
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) | 14.00 | 2.90 | 16.90 |
| CEMENT MASON/CONCRETE FINISHER | 13.94 | — | 13.94 |
| CARPENTER, EXCLUDES FORM WORK | 25.00 | — | 25.00 |
| CARPENTER (FORM WORK ONLY) | 13.63 | — | 13.63 |
| BRICKLAYER | 18.33 | 2.50 | 20.83 |