| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 26.92 | 13.09 | 40.01 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | 41.40 | 13.14 | 54.54 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | 28.77 | 19.05 | 47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | 32.10 | 17.38 | 49.48 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | 41.00 | 16.03 | 57.03 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 41.00 | 16.03 | 57.03 |
| ROOFER | 26.30 | 10.34 | 36.64 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 33.38 | 16.36 | 49.74 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | 11.60 | — | 11.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.82 0.00 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | 12.91 | — | 12.91 |
| OPERATOR: LOADER (FRONT END) | 16.18 | — | 16.18 |
| OPERATOR: GRADER/BLADE | 14.28 | 1.70 | 15.98 |
| OPERATOR: BULLDOZER | 20.64 | 2.35 | 22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.25 | 4.35 | 25.60 |
| LABORER: PIPELAYER | 12.39 | — | 12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.00 | 1.91 | 14.91 |
| LABORER: MASON TENDER - BRICK | 12.00 | — | 12.00 |
| LABORER: COMMON OR GENERAL | 9.31 | — | 9.31 |
| IRONWORKER, REINFORCING | 17.11 | — | 17.11 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | 20.08 | 5.43 | 25.51 |
| DRYWALL FINISHER/TAPER | 13.80 | — | 13.80 |
| CEMENT MASON/CONCRETE FINISHER | 16.72 | — | 16.72 |
| CARPENTER, EXCLUDES DRYWALL HANGING | 15.50 | 2.80 | 18.30 |
| CARPENTER (DRYWALL HANGING ONLY) | 15.50 | 2.80 | 18.30 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 25.92 | 11.89 | 37.81 |
| PLUMBER | 33.14 | — | 33.14 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 17.02 | 10.00 | 27.02 |
| LABORER: COMMON OR GENERAL | 13.00 | — | 13.00 |
| IRONWORKER, STRUCTURAL | 17.10 | 4.22 | 21.32 |
| ELECTRICIAN | 19.08 | — | 19.08 |
| CEMENT MASON/CONCRETE FINISHER | 18.57 | — | 18.57 |
| CARPENTER | 14.18 | — | 14.18 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: WATER TRUCK | 12.00 | — | 12.00 |
| TRUCK DRIVER: DUMP TRUCK | 12.87 | — | 12.87 |
| TRUCK DRIVER (TANDEM AXLE/SEMI TRAILER) | 13.72 | — | 13.72 |
| TRUCK DRIVER (PICKUP TRUCK) | 12.32 | — | 12.32 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | 12.86 | — | 12.86 |
| TRUCK DRIVER (LOWBOY/FLOAT) | 13.90 | — | 13.90 |
| TRUCK DRIVER (FLATBED TRUCK) | 14.69 | — | 14.69 |
| TRAFFIC SIGNAL INSTALLER | 17.37 | — | 17.37 |
| POWER EQUIPMENT OPERATOR: SCRAPER | 13.16 | — | 13.16 |
| POWER EQUIPMENT OPERATOR: OILER | 13.65 | — | 13.65 |
| POWER EQUIPMENT OPERATOR: MECHANIC | 15.60 | — | 15.60 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | 12.90 | — | 12.90 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | 14.96 | — | 14.96 |
| POWER EQUIPMENT OPERATOR: CRANE | 17.12 | — | 17.12 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 14.20 | — | 14.20 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | 12.53 | — | 12.53 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE | 13.64 | — | 13.64 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | 13.63 | — | 13.63 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | 13.43 | — | 13.43 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | 12.56 | — | 12.56 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | 12.01 | — | 12.01 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) | 12.73 | — | 12.73 |
| POWER EQUIPMENT OPERATOR: (MIXER) | 14.43 | — | 14.43 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | 14.56 | — | 14.56 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | 14.94 | — | 14.94 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | 13.54 | — | 13.54 |
| POWER EQUIPMENT OPERATOR: (CONCRETE SAW) | 11.70 | — | 11.70 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 13.61 0.00 POWER EQUIPMENT OPERATOR: (BROOM) | 11.97 | — | 11.97 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | 14.03 | — | 14.03 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | 12.53 | — | 12.53 |
| LABORER: PIPELAYER | 12.50 | — | 12.50 |
| LABORER: COMMON OR GENERAL | 10.12 | — | 10.12 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | 11.05 | — | 11.05 |
| LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | 12.89 | — | 12.89 |
| LABORER (LANDSCAPE) | 9.63 | — | 9.63 |
| LABORER (ASPHALT RAKER AND SHOVELER) | 10.00 | — | 10.00 |
| IRONWORKER, STRUCTURAL | 14.21 | — | 14.21 |
| IRONWORKER, REINFORCING | 12.67 | — | 12.67 |
| CEMENT MASON/CONCRETE FINISHER | 12.38 | — | 12.38 |
| CARPENTER (INCLUDES FORM WORK) | 12.22 | — | 12.22 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 51.00 | 23.80 | 74.80 |
| POWER EQUIPMENT OPERATOR: GROUP10 OILER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER(ASPHALT AND DIRT) | 30.87 | 19.05 | 49.92 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE; EXCAVATOR , BACKHOE AND GRADER/BLADE | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER (STRUCTURAL, REINFORCING, AND ORNAMENTAL) | 32.10 | 17.38 | 49.48 |
| CEMENT MASON/CONCRETE FINISHER | 33.52 | 15.88 | 49.40 |
| OPERATOR: TRACKHOE | 17.50 | 2.78 | 20.28 |
| OPERATOR: SCRAPER | 16.00 | 1.55 | 17.55 |
| OPERATOR: MECHANIC | 19.61 | 9.39 | 29.00 |
| OPERATOR: LOADER (FRONT END) | 13.51 | — | 13.51 |
| OPERATOR: DRILL | 17.15 | 0.78 | 17.93 |
| LABORER: PIPELAYER | 11.13 | — | 11.13 |
| LABORER: COMMON OR GENERAL | 11.81 | 1.09 | 12.90 |
| FORM WORKER | 11.77 | — | 11.77 |
| TRUCK DRIVER ((3) DUMP TRUCK) | 30.85 | 16.65 | 47.50 |