Building Published 05/18/2026. 29 classifications. Covers 1 county: Comanche
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 26.92 | 13.09 | 40.01 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | 41.40 | 13.14 | 54.54 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | 28.77 | 19.05 | 47.82 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | 34.07 | 19.05 | 53.12 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | 35.40 | 19.05 | 54.45 |
| POWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | 36.14 | 19.05 | 55.19 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | 27.25 | 19.05 | 46.30 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | 38.09 | 19.05 | 57.14 |
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | 32.10 | 17.38 | 49.48 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | 41.00 | 16.03 | 57.03 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 41.00 | 16.03 | 57.03 |
| ROOFER | 26.30 | 10.34 | 36.64 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 33.38 | 16.36 | 49.74 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | 11.60 | — | 11.60 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.82 0.00 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | 12.91 | — | 12.91 |
| OPERATOR: LOADER (FRONT END) | 16.18 | — | 16.18 |
| OPERATOR: GRADER/BLADE | 14.28 | 1.70 | 15.98 |
| OPERATOR: BULLDOZER | 20.64 | 2.35 | 22.99 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.25 | 4.35 | 25.60 |
| LABORER: PIPELAYER | 12.39 | — | 12.39 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.00 | 1.91 | 14.91 |
| LABORER: MASON TENDER - BRICK | 12.00 | — | 12.00 |
| LABORER: COMMON OR GENERAL | 9.31 | — | 9.31 |
| IRONWORKER, REINFORCING | 17.11 | — | 17.11 |
| ELECTRICIAN (LOW VOLTAGE WIRING) | 20.08 | 5.43 | 25.51 |
| DRYWALL FINISHER/TAPER | 13.80 | — | 13.80 |
| CEMENT MASON/CONCRETE FINISHER | 16.72 | — | 16.72 |
| CARPENTER, EXCLUDES DRYWALL HANGING | 15.50 | 2.80 | 18.30 |
| CARPENTER (DRYWALL HANGING ONLY) | 15.50 | 2.80 | 18.30 |