Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | 38.34 | 20.51 | 58.85 |
| CEMENT MASON/CONCRETE FINISHER | 32.53 | 22.10 | 54.63 |
| SOFT FLOOR LAYER | 25.61 | 17.40 | 43.01 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | 31.59 | 23.24 | 54.83 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | 42.50 | 27.23 | 69.73 |
| IRONWORKER: ORNAMENTAL | 35.49 | 32.30 | 67.79 |
| IRONWORKER, STRUCTURAL | 35.49 | 32.30 | 67.79 |
| IRONWORKER, REINFORCING | 35.49 | 32.30 | 67.79 |
| PAINTER (SPRAY) | 28.35 | 25.21 | 53.56 |
| PAINTER: BRUSH AND ROLLER | 27.25 | 25.24 | 52.49 |
| PLUMBER | 42.20 | 29.80 | 72.00 |
| PIPEFITTER | 37.47 | 27.40 | 64.87 |
| ROOFER | 36.70 | 18.00 | 54.70 |
| PAINTER: DRYWALL FINISHING/TAPING | 24.81 | 21.13 | 45.94 |
| OPERATOR: FORKLIFT | 32.70 | 24.12 | 56.82 |
| OPERATOR: CRANE | 36.52 | 26.91 | 63.43 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 41.10 | 19.26 | 60.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 43.97 | 24.17 | 68.14 |
| MILLWRIGHT | 27.08 | 19.72 | 46.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 23.84 | 14.18 | 38.02 |
| LABORER: COMMON OR GENERAL | 24.35 | 16.27 | 40.62 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 29.01 | 21.31 | 50.32 |
| INSTALLER: METAL STUDS | 26.70 | 17.40 | 44.10 |
| HVAC MECHANIC: HVAC PIPE INSTALLATION | 31.30 | 23.84 | 55.14 |
| GLAZIER | 25.03 | 19.70 | 44.73 |
| CARPENTER (FORM WORK ONLY) | 25.84 | 17.56 | 43.40 |
| CARPENTER (DRYWALL HANGING ONLY) | 26.99 | 17.40 | 44.39 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 26.00 | 18.35 | 44.35 |
| BRICKLAYER | 31.61 | 24.98 | 56.59 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| PLUMBER (EXCLUDES HVAC UNIT INSTALLATION) | 27.44 | 23.40 | 50.84 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 17.41 | 2.46 | 19.87 |
| ROOFER | 16.64 | — | 16.64 |
| PLUMBER (HVAC UNIT INSTALLATION ONLY) | 20.91 | — | 20.91 |
| PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING | 18.47 | — | 18.47 |
| OPERATOR: BULLDOZER | 21.72 | — | 21.72 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 27.74 | — | 27.74 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.73 | — | 21.73 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 16.00 | 10.45 | 26.45 |
| LABORER: COMMON OR GENERAL | 14.73 | — | 14.73 |
| ELECTRICIAN | 17.08 | — | 17.08 |
| DRYWALL FINISHER/TAPER | 21.51 | — | 21.51 |
| CEMENT MASON/CONCRETE FINISHER | 22.60 | 5.75 | 28.35 |
| CARPENTER, EXCLUDING SIDING INSTALLATION (METAL, ALUMINUM, VINYL) AND DRYWALL HANGING AND METAL STUD INSTALLATION | 20.89 | — | 20.89 |
| CARPENTER (SIDING INSTALLATION ONLY - METAL, ALUMINUM, VINYL) | 16.35 | — | 16.35 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | 23.14 | — | 23.14 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 43.40 | 31.72 | 75.12 |
| THE HOLIDAY | 42.29 | 30.66 | 72.95 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | 52.86 | 35.60 | 88.46 |
| OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | 47.57 | 31.03 | 78.60 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | 42.29 | 30.66 | 72.95 |
| THE HOLIDAY | 31.72 | 29.87 | 61.59 |
| IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS | 60.84 | 35.00 | 95.84 |
| IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS | 43.26 | 34.85 | 78.11 |
| OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 56.81 | 35.75 | 92.56 |
| WORKING DAY AFTER THE HOLIDAY | 58.38 | 35.75 | 94.13 |
| OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER FOOTNOTE: B PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 59.88 | 35.75 | 95.63 |
| OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT) CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER FOOTNOTE: B. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 51.41 | 35.00 | 86.41 |
| WORKING DAY AFTER THE HOLIDAY | 61.38 | 35.75 | 97.13 |
| IMMEDIATELY FOLLOWING THE HOLIDAY | 36.61 | 34.85 | 71.46 |
| WELL POINT AGGREGATE PLANT; BOILER (USED IN CONJUNCTION WITH PRODUCTION); CEMENT AND BIN OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE PAVER OR MIXER (16S AND UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN; FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN USED FOR PRODUCTION); REVINIUS WIDENER; SHELL WINDER; STEAM CLEANER; TRACTOR FOOTNOTE: B PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 54.42 | 35.00 | 89.42 |
| GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 51.81 | 35.75 | 87.56 |
| PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | 40.10 | 34.85 | 74.95 |
| DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER (UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE; HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER (TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE; PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE; SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER; TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER; WINCH; WINCH CAT FOOTNOTE: B. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 57.21 | 35.00 | 92.21 |
| WORKING DAY AFTER THE HOLIDAY | 54.68 | 35.75 | 90.43 |
| PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | 40.79 | 34.85 | 75.64 |
| DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 58.43 | 35.00 | 93.43 |
| AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 55.38 | 35.75 | 91.13 |
| IMMEDIATELY FOLLOWING THE HOLIDAY | 41.26 | 34.85 | 76.11 |
| IRONWORKERS: IRONWORKER (RODMEN) (TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST UNION) | 35.49 | 32.30 | 67.79 |
| IRONWORKERS: FENCE ERECTOR (TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST UNION) | 34.06 | 30.80 | 64.86 |
| IRONWORKERS: SHEETER (TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY, PRATTSBURG, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYLAND, WAYNE WOODHULL) | 36.00 | 30.80 | 66.80 |
| IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS, FENCE ERECTORS, PRECAST CONCRETE ERECTOR (TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY, LINDLEY, PRATTSBURG, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYLAND, WAYNE WOODHULL) | 35.75 | 30.80 | 66.55 |
| LABORER (HEAVY & HIGHWAY), GROUP 2 (ZONE III) ALL ROCK OR DRILL MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATOR; ASPHALT RAKER; POWDERMAN; BLASTERS; FORM SETTERS; STONE OR GRANITE CURB SETTERS FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 35.46 | 23.85 | 59.31 |
| LABORER (HEAVY & HIGHWAY), GROUP 1 (ZONE III) LABORERS; FLAGGERS; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOTMAN; GIN BUGGY; HAND OR MACHINE VIBRATOR; JACKHAMMER; MASON TENDER; MORTAR MIXER; PAVEMENT BREAKER; HANDLERS OF ALL STEEL MESH; SMALL GENERATORS FOR LABORERS' TOOL; INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPELAYERS; VIBRATOR TYPE ROLLERS; TAMPER; DRILL DOCTOR; TAIL OR SCREW OPERATOR ON ASPHALT PAVER; WATER PUMP OPERATORS (1- 1/2"" AND SINGLE DIAPHRAM); NOZZLE (ASPHALT, GUNNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 35.26 | 23.85 | 59.11 |
| PLUMBER, PIPEFITTER, STEAMFITTER: INCLUDING HVAC WORK (TOWNS OF ADDISON, BATH, BRADFORD, CAMPBELL, CANTON, CORNING, ERWIN, HORNBY, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA AND WAYNE COUNTIES) | 35.51 | 24.57 | 60.08 |
| ROOFER | 11.62 | 3.21 | 14.83 |
| LABORER | 11.02 | 2.12 | 13.14 |
| TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE MOBILE UNIT; OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED (TOWNSHIPS OF AVOCA, CANISTEO, COHOCTON, DANSVILLE, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HOWARD, JASPER, PRATTSBURG, PULTENEY, TROUPSBURG, WEST UNION, WHEELER.) A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 35.83 | 31.58 | 67.41 |
| TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATCH TRUCK; MECHANICS; SEMI- TRAILORS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK (TOWNSHIPS OF AVOCA, CANISTEO, COHOCTON, DANSVILLE, FREEMONT, GREENWOOD, HARTSVILLE, HORNELL, HOWARD, JASPER, PRATTSBURG, PULTENEY, TROUPSBURG, WEST UNION, WHEELER.) A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 35.48 | 31.58 | 67.06 |
| TRUCK DRIVER: GROUP 3 EUCLID-TYPE; OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS); STRADDLE TRUCKS; PUSHER; ARTICULATE DUMPED TRUCKS; LOW BOY TRAILERS; SEMI TRAILERS; ASPHALT DISTRIBUTORS; FUEL TRUCK (STEUBEN COUNTY TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYNE, WHEELER AND WOODHULL) FOOTNOTES A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 26.52 | 15.91 | 42.43 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS); TRANSIT MIX (UNDER 5 YDS); TRANSIT MIX (OVER 5 YDS); FLAT OR STAKE BODY (TANDEM); A-FRAME/WINCH TRUCKS; DRY BATCH TRUCK; TRUCK MOUNTED SWEEPER AND VAC TRUCKS; DUMPSTER (TANDEM) (STEUBEN COUNTY TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYNE, WHEELER AND WOODHULL) FOOTNOTES A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 26.03 | 15.91 | 41.94 |
| TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE AXLE); DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE); STAKE BODY TRUCK (SINGLE AXLE); DUMPSTER (SINGLE AXLE) (STEUBEN COUNTY: TOWNS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL, CATON, CORNING, ERWIN, HORNBY, HOWARD, LINDLEY, PULTENEY, RATHBONE, THURSTON, TUSCARORA, URBANA, WAYNE, WHEELER AND WOODHULL) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 25.96 | 15.91 | 41.87 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY | 44.50 | 36.05 | 80.55 |
| ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY | 44.50 | 36.05 | 80.55 |
| ATTICA, BENNINGTON, EAGLE, JAVA, ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY | 22.90 | 21.38 | 44.28 |
| EAGLE, JAVA, ORANGEVILLE, SHELDON AND WETHERFIELD) WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX FIBER OPTIC CABLE AND EQUIPMENT, RAILROAD COMMUNICATIONS, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS); LAN (LOCAL AREA NETWORKS) AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK). ALSO, INSTALLATION OF SOUND SYSTEMS, NURSES CALL SYSTEMS, INTERCOM SYSTEMS, STAFF REGISTRY/LOCATING/SIGNALING SYSTEMS, ANTENNA SYSTEMS AND ASSOCIATED DEVICES; INSTALLATION OF SECURITY SYSTEMS AND APPARATUS, AND CABLING FROM VDT'S TO COMPUTERS. THIS WORK DOES NOT APPLY TO NEW CONSTRUCTION, OR TO THE INSTALLATION OF RACEWAY SYSTEMS AND BOXES FOR THE ABOVE WORK. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING, CHRISTMAS DAY | 14.20 | 14.02 | 28.22 |
| ELECTRICIAN (CORTLAND AND TOMPKINS COUNTIES) | 50.50 | 35.03 | 85.53 |
| ELECTRICIAN (WYOMING (REMAINDER OF COUNTY)) | 44.30 | 30.20 | 74.50 |
| CABLE SPLICER (ALLEGANY (TOWNSHIPS OF ALMA, BELFAST, BELMONT, BOLIVAR, CONEADEA, CENTERVILLE, CLARKSVILLE, CUBA, FRIENDSHIP, GENESEE, NEW HUDSON, RUSHFORD, SCIO AND WIRT CATTARAUGUS (REMAINDER OF COUNTY)) | 35.75 | 20.68 | 56.43 |
| ELECTRICIAN (ALLEGANY (TOWNSHIPS OF ALMA, BELFAST, BELMONT, BOLIVAR, CONEADEA, CENTERVILLE, CLARKSVILLE, CUBA, FRIENDSHIP, GENESEE, NEW HUDSON, RUSHFORD, SCIO AND WIRT CATTARAUGUS (REMAINDER OF COUNTY)) | 42.50 | 27.23 | 69.73 |
| ELECTRICIAN (ALLEGANY (REMAINDER OF COUNTY), SCHUYLER (REMAINDER OF COUNTY) AND STEUBEN COUNTIES) | 43.40 | 31.72 | 75.12 |
| ELECTRICIAN (SENECA (TOWNSHIPS OF COVERT AND LODI) AND SCHUYLER (TOWNSHIPS OF CATHARINE, CAYUTA, HECTOR)) | 44.50 | 31.89 | 76.39 |
| ELECTRICIAN (SENECA (REMAINDER OF COUNTY) AND YATES COUNTY) | 45.00 | 31.12 | 76.12 |
| THE HOLIDAY | 42.29 | 30.66 | 72.95 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | 52.86 | 35.60 | 88.46 |
| OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | 47.57 | 31.03 | 78.60 |
| ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY | 42.29 | 30.66 | 72.95 |
| THE HOLIDAY | 31.72 | 29.87 | 61.59 |
| fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:) | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | 61.56 | 36.21 | 97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:) | 61.56 | 36.21 | 97.77 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | 55.40 | 31.78 | 87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | 55.40 | 31.78 | 87.18 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | 55.40 | 31.78 | 87.18 |
| fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | 35.34 | 30.12 | 65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:) | 35.34 | 30.12 | 65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | 35.34 | 30.12 | 65.46 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | 64.59 | 42.92 | 107.51 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:) | 63.14 | 33.82 | 96.96 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | 49.25 | 31.15 | 80.40 |
| EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | 49.25 | 31.15 | 80.40 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | 61.56 | 36.21 | 97.77 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | 38.73 | 6.93 | 45.66 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | 20.53 | 6.39 | 26.92 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | 40.81 | 6.99 | 47.80 |
| POWER EQUIPMENT OPERATORS:: PAVERS (CATTARAUGUS AND WYOMING COUNTIES) A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY | 47.39 | 36.89 | 84.28 |
| POWER EQUIPMENT OPERATORS: PAVER (ALLEGANY, SCHUYLER, STEUBEN AND YATES COUNTIES) FOOTNOTE A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | 40.80 | 28.25 | 69.05 |
| AFTER THE HOLIDAY | 40.80 | 25.15 | 65.95 |
| TRUCK DRIVER: DUMP | 16.94 | 7.11 | 24.05 |
| POWER EQUIPMENT OPERATORS: BULLDOZERS | 22.28 | 11.79 | 34.07 |
| POWER EQUIPMENT OPERATORS: BACKHOES | 22.08 | 11.31 | 33.39 |
| POWER EQUIPMENT OPERATORS: (TRACTORS) | 20.57 | 10.95 | 31.52 |
| POWER EQUIPMENT OPERATORS: (ROLLERS) | 21.08 | 11.73 | 32.81 |
| POWER EQUIPMENT OPERATORS: (LOADERS) | 22.10 | 11.44 | 33.54 |
| POWER EQUIPMENT OPERATORS: (EXCAVATORS) | 22.63 | 12.14 | 34.77 |
| LABORERS: UNSKILLED | 17.20 | 6.63 | 23.83 |
| LABORERS: PIPELAYERS | 17.79 | 6.70 | 24.49 |
| LABORERS: (RAKERS) | 17.04 | 6.30 | 23.34 |
| CEMENT MASON/CONCRETE FINISHER | 17.45 | 7.90 | 25.35 |
| CARPENTER | 20.61 | 7.49 | 28.10 |