Building Published 05/18/2026. 29 classifications. Covers 1 county: Steuben
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TILE SETTER | 38.34 | 20.51 | 58.85 |
| CEMENT MASON/CONCRETE FINISHER | 32.53 | 22.10 | 54.63 |
| SOFT FLOOR LAYER | 25.61 | 17.40 | 43.01 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | 31.59 | 23.24 | 54.83 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | 42.50 | 27.23 | 69.73 |
| IRONWORKER: ORNAMENTAL | 35.49 | 32.30 | 67.79 |
| IRONWORKER, STRUCTURAL | 35.49 | 32.30 | 67.79 |
| IRONWORKER, REINFORCING | 35.49 | 32.30 | 67.79 |
| PAINTER (SPRAY) | 28.35 | 25.21 | 53.56 |
| PAINTER: BRUSH AND ROLLER | 27.25 | 25.24 | 52.49 |
| PLUMBER | 42.20 | 29.80 | 72.00 |
| PIPEFITTER | 37.47 | 27.40 | 64.87 |
| ROOFER | 36.70 | 18.00 | 54.70 |
| PAINTER: DRYWALL FINISHING/TAPING | 24.81 | 21.13 | 45.94 |
| OPERATOR: FORKLIFT | 32.70 | 24.12 | 56.82 |
| OPERATOR: CRANE | 36.52 | 26.91 | 63.43 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 41.10 | 19.26 | 60.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 43.97 | 24.17 | 68.14 |
| MILLWRIGHT | 27.08 | 19.72 | 46.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 23.84 | 14.18 | 38.02 |
| LABORER: COMMON OR GENERAL | 24.35 | 16.27 | 40.62 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 29.01 | 21.31 | 50.32 |
| INSTALLER: METAL STUDS | 26.70 | 17.40 | 44.10 |
| HVAC MECHANIC: HVAC PIPE INSTALLATION | 31.30 | 23.84 | 55.14 |
| GLAZIER | 25.03 | 19.70 | 44.73 |
| CARPENTER (FORM WORK ONLY) | 25.84 | 17.56 | 43.40 |
| CARPENTER (DRYWALL HANGING ONLY) | 26.99 | 17.40 | 44.39 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 26.00 | 18.35 | 44.35 |
| BRICKLAYER | 31.61 | 24.98 | 56.59 |