Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| TILE SETTER | 27.35 | 22.20 | 49.55 |
| BRICKLAYER | 35.21 | 24.26 | 59.47 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | 28.29 | 21.42 | 49.71 |
| MILLWRIGHT | 40.04 | 26.47 | 66.51 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 33.71 | 25.25 | 58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.28 | 25.25 | 72.53 |
| IRONWORKER: STRUCTURAL | 36.55 | 29.51 | 66.06 |
| IRONWORKER: REINFORCING | 36.55 | 29.51 | 66.06 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | 30.02 | 27.43 | 57.45 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | 30.72 | 12.95 | 43.67 |
| LABORER : COMMON OR GENERAL; SANDBLASTER | 27.21 | 13.45 | 40.66 |
| PAINTER: SPRAY | 27.07 | 16.56 | 43.63 |
| PAINTER: DRYWALL FINISHING/TAPING | 27.32 | 16.72 | 44.04 |
| PAINTER: BRUSH AND ROLLER | 27.07 | 16.46 | 43.53 |
| PLASTERER | 21.18 | 12.43 | 33.61 |
| CEMENT MASON/CONCRETE FINISHER | 24.63 | 12.88 | 37.51 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 32.50 24.97 PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 32.50 | 24.97 | 57.47 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | 32.50 | 24.97 | 57.47 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 41.34 | 27.39 | 68.73 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | 44.45 | 30.43 | 74.88 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | 44.45 | 30.43 | 74.88 |
| TRUCK DRIVER: FLATBED TRUCK | 16.80 | 3.97 | 20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 15.65 | 3.12 | 18.77 |
| ROOFER | 15.73 | 7.41 | 23.14 |
| OPERATOR: LOADER | 24.26 | 11.19 | 35.45 |
| OPERATOR: TRACTOR | 19.60 | 7.31 | 26.91 |
| OPERATOR: ROLLER | 28.02 | 7.07 | 35.09 |
| OPERATOR: GRADER/BLADE | 24.04 | 6.03 | 30.07 |
| OPERATOR: BULLDOZER | 22.34 | 1.22 | 23.56 |
| LABORER: LANDSCAPE & IRRIGATION | 12.84 | — | 12.84 |
| GLAZIER | 16.95 | 4.74 | 21.69 |
| FLOOR LAYER: CARPET | 19.59 | 7.57 | 27.16 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | 17.00 | 3.51 | 20.51 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 19.82 | 7.31 | 27.13 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) (LAKE & MASON COUNTIES) | 31.50 | 21.15 | 52.65 |
| CARPENTER: FORM WORK ONLY (ST. JOSEPH COUNTY) | 28.29 | 21.42 | 49.71 |
| CARPENTER: FORM WORK ONLY (SANILAC COUNTY) | 42.44 | 31.43 | 73.87 |
| ELECTRICIAN (SANILAC COUNTY) | 51.32 | 28.54 | 79.86 |
| ELECTRICIAN (ST. JOSEPH COUNTY) | 42.78 | 21.84 | 64.62 |
| ELECTRICIAN (LAKE (TOWNSHIPS OF CHASE, CHERRY VALLEY, LAKE, PINORA, PLEASANT PLAINS, SWEETWATER, WEBBER & YATES) & MASON (TOWNSHIPS OF AMBER, BRANCH, CUSTER, EDEN, HAMLIN. LOGAN, PERE MARQUETTE, RIVERTON, SHERIDAN, SHERMAN, SUMMIT & VICTORY) COUNTIES) | 36.52 | 25.15 | 61.67 |
| ELECTRICIAN (LAKE (TOWNSHIPS OF DOVER, EDEN, ELK, ELLSWORTH, NEWKIRK, PEACOCK & SAUBLE) & MASON (TOWNSHIPS OF FREESOIL, GRANT & MEADE) COUNTIES) | 36.62 | 23.05 | 59.67 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR | 39.95 | 25.25 | 65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | 40.52 | 25.25 | 65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | 41.25 | 25.25 | 66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY) | 45.98 | 25.25 | 71.23 |
| OPERATING ENGINEERS: GROUP 5 (AREA 2) | 32.98 | 25.25 | 58.23 |
| OPERATING ENGINEERS: GROUP 4 (AREA 2) | 41.32 | 25.25 | 66.57 |
| OPERATING ENGINEERS: GROUP 3 (AREA 2) | 44.00 | 25.25 | 69.25 |
| OPERATING ENGINEERS: GROUP 2 (AREA 2) | 45.68 | 25.25 | 70.93 |
| OPERATING ENGINEERS: GROUP 1 (AREA 2) | 48.98 | 25.25 | 74.23 |
| OPERATING ENGINEER: GROUP 5 (AREA 1) | 32.98 | 25.25 | 58.23 |
| OPERATING ENGINEER: GROUP 4 (AREA 1) | 41.32 | 25.25 | 66.57 |
| OPERATING ENGINEER: GROUP 3 (AREA 1) | 44.00 | 25.25 | 69.25 |
| OPERATING ENGINEER: GROUP 2 (AREA 1) | 45.68 | 25.25 | 70.93 |
| OPERATING ENGINEER: GROUP 1 (AREA 1) | 48.98 | 25.25 | 74.23 |
| IRONWORKER: STRUCTURAL (SANILAC COUNTY) | 36.55 | 35.93 | 72.48 |
| IRONWORKER: REINFORCING (SANILAC COUNTY) | 36.55 | 33.37 | 69.92 |
| IRONWORKER: STRUCTURAL (LAKE, MASON & ST. JOSEPH COUNTIES) | 36.55 | 34.04 | 70.59 |
| IRONWORKER: REINFORCING (LAKE, MASON & ST. JOSEPH COUNTIES) | 36.55 | 34.04 | 70.59 |
| LABORER: (4) GRADE CHECKER (LAKE, MASON, ST. JOE) | 22.73 | 12.95 | 35.68 |
| LABORER: (1) COMMON OR GENERAL (LAKE, MASON, ST JOE) | 22.42 | 12.95 | 35.37 |
| LABORER: (4) GRADE CHECKER (SANILAC) | 22.73 | 12.95 | 35.68 |
| LABORER: (1) COMMON OR GENERAL (SANILAC) | 22.42 | 12.95 | 35.37 |
| LABORER: COMMON OR GENERAL (ST. JOSEPH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | 27.21 | 13.45 | 40.66 |
| LABORER: COMMON OR GENERAL (LAKE & MASON COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION) | 28.56 | 12.95 | 41.51 |
| LABORER: COMMON OR GENERAL (SANILAC COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION) | 30.35 | 17.90 | 48.25 |
| CEMENT MASON/CONCRETE FINISHER (ST. JOSEPH COUNTY) | 24.63 | 12.88 | 37.51 |
| CEMENT MASON/CONCRETE FINISHER (LAKE & MASON COUNTIES) | 22.02 | 12.38 | 34.40 |
| CEMENT MASON/CONCRETE FINISHER (SANILAC COUNTY) | 32.23 | 22.11 | 54.34 |
| PLUMBER (SANILAC COUNTY) | 35.77 | 35.13 | 70.90 |
| PLUMBER/PIPEFITTER (LAKE & MASON COUNTIES) | 39.89 | 23.82 | 63.71 |
| PLUMBER/PIPEFITTER (ST JOSEPH COUNTY) | 35.20 | 22.35 | 57.55 |
| PIPEFITTER (SANILAC COUNTY) | 40.41 | 29.35 | 69.76 |
| TRUCK DRIVER: DUMP TRUCK | 14.06 | 1.25 | 15.31 |
| OPERATOR: ROLLER | 13.74 | 7.93 | 21.67 |
| OPERATOR: GRADER/BLADE | 15.50 | 3.62 | 19.12 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 12.98 | 6.12 | 19.10 |
| LABORER: PIPELAYER | 15.28 | 3.99 | 19.27 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 15.97 | 3.51 | 19.48 |
| LABORER: LANDSCAPE | 10.89 | 1.74 | 12.63 |
| CARPENTER, EXCLUDES FORM WORK | 23.97 | 6.29 | 30.26 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | 33.55 | 0.75 | 34.30 |