Building Published 05/18/2026. 39 classifications. Covers 1 county: St Joseph
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| TILE SETTER | 27.35 | 22.20 | 49.55 |
| BRICKLAYER | 35.21 | 24.26 | 59.47 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | 28.29 | 21.42 | 49.71 |
| MILLWRIGHT | 40.04 | 26.47 | 66.51 |
| POWER EQUIPMENT OPERATOR: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| POWER EQUIPMENT OPERATOR: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 33.71 | 25.25 | 58.96 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE/EXCAVATOR; CRANE; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 41.28 | 25.25 | 66.53 |
| AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.28 | 25.25 | 72.53 |
| IRONWORKER: STRUCTURAL | 36.55 | 29.51 | 66.06 |
| IRONWORKER: REINFORCING | 36.55 | 29.51 | 66.06 |
| IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY) | 30.02 | 27.43 | 57.45 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | 30.72 | 12.95 | 43.67 |
| LABORER : COMMON OR GENERAL; SANDBLASTER | 27.21 | 13.45 | 40.66 |
| PAINTER: SPRAY | 27.07 | 16.56 | 43.63 |
| PAINTER: DRYWALL FINISHING/TAPING | 27.32 | 16.72 | 44.04 |
| PAINTER: BRUSH AND ROLLER | 27.07 | 16.46 | 43.53 |
| PLASTERER | 21.18 | 12.43 | 33.61 |
| CEMENT MASON/CONCRETE FINISHER | 24.63 | 12.88 | 37.51 |
| PLUMBER (EXCLUDING HVAC PIPE & SYSTEM INSTALLATION).$ 32.50 24.97 PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 32.50 | 24.97 | 57.47 |
| PIPEFITTER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION) | 32.50 | 24.97 | 57.47 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 41.34 | 27.39 | 68.73 |
| SHEET METAL WORKER (HVAC DUCT & SYSTEM INSTALLATION) | 44.45 | 30.43 | 74.88 |
| SHEET METAL WORKER (EXCLUDING HVAC DUCT & SYSTEM INSTALLATION) | 44.45 | 30.43 | 74.88 |
| TRUCK DRIVER: FLATBED TRUCK | 16.80 | 3.97 | 20.77 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 15.65 | 3.12 | 18.77 |
| ROOFER | 15.73 | 7.41 | 23.14 |
| OPERATOR: LOADER | 24.26 | 11.19 | 35.45 |
| OPERATOR: TRACTOR | 19.60 | 7.31 | 26.91 |
| OPERATOR: ROLLER | 28.02 | 7.07 | 35.09 |
| OPERATOR: GRADER/BLADE | 24.04 | 6.03 | 30.07 |
| OPERATOR: BULLDOZER | 22.34 | 1.22 | 23.56 |
| LABORER: LANDSCAPE & IRRIGATION | 12.84 | — | 12.84 |
| GLAZIER | 16.95 | 4.74 | 21.69 |
| FLOOR LAYER: CARPET | 19.59 | 7.57 | 27.16 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | 17.00 | 3.51 | 20.51 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 19.82 | 7.31 | 27.13 |