Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Shiawassee County, Michigan

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
MI20260151 rev 2 · 05/18/2026 · 38 classifications
ClassificationBase rateFringeTotal
ASBESTOS WORKER/HEAT & FROST INSULATOR40.0023.6563.65
BOILERMAKER43.5037.6481.14
HOLIDAY WITHIN THE CURRENT CALENDAR YEAR33.3123.2056.51
HOLIDAY WITHIN THE CURRENT CALENDAR YEAR34.4324.4458.87
HOLIDAY WITHIN THE CURRENT CALENDAR YEAR38.0026.4964.49
CARPENTER (EXCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, AND SOFT FLOOR LAYER - CARPET)35.8623.6959.55
CARPENTER (ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION)36.4623.6960.15
MILLWRIGHT42.9239.1382.05
OPERATOR: POWER EQUIPMENT: GROUP 6 OILER CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY31.2325.2556.48
OPERATOR: POWER EQUIPMENT: GROUP 5 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY33.7125.2558.96
OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; FORK TRUCK (OVER 20' LIFT) CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY39.5725.2564.82
OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR; CRANE; LOADER; PAVER; SCRAPER; STIFF LEG DERRICK CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY41.2825.2566.53
DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY43.9325.2569.18
OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY47.2825.2572.53
IRONWORKER: STRUCTURAL (METAL BUILDING ERECTION ONLY)30.0227.4357.45
IRONWORKER, STRUCTURAL36.5535.9372.48
IRONWORKER, REINFORCING36.5533.3769.92
LABORER (COMMON OR GENERAL; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; PIPELAYER; AND SANDBLASTER)29.4616.1045.56
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2 LEVEL D)31.0117.2948.30
POWER EQUIPMENT OPERATORS - HAZARDOUS WASTE REMOVAL:, AREA 2: ENGINEER WHEN OPERATING CRANE WITH BOOM AND JIB OR LEADS 140' OR LONGER (AREA 2 LEVEL D WHEN CAPPING LANDFILL)31.0117.1948.20
PAINTER: SPRAY31.0117.2948.30
PAINTER: BRUSH & ROLER32.5818.1250.70
DRYWALL FINISHER/TAPER (DRYWALL SANDING)33.5418.1251.66
CEMENT MASON/CONCRETE FINISHER25.5812.8838.46
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION & EXCLUDES HVAC SYSTEM INSTALLATION)46.6122.9569.56
PLUMBER (EXCLUDES HVAC PIPE & SYSTEM INSTALLATION)46.6122.9569.56
SPRINKLER FITTER (FIRE SPRINKLERS)41.3427.3968.73
SHEET METAL WORKER (INCLDUING HVAC DUCT & SYSTEM INSTALLATION)35.1923.5758.76
TRUCK DRIVER: FLATBED TRUCK16.803.9720.77
TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK15.653.1218.77
ROOFER15.737.4123.14
OPERATOR: TRACTOR19.607.3126.91
OPERATOR: ROLLER28.027.0735.09
OPERATOR: GRADER/BLADE24.046.0330.07
OPERATOR: BULLDOZER22.341.2223.56
LABORER: LANDSCAPE & IRRIGATION12.84—12.84
GLAZIER16.954.7421.69
FLOOR LAYER: CARPET19.597.5727.16
Heavy
MI20260044 rev 1 · 05/18/2026 · 72 classifications
ClassificationBase rateFringeTotal
CARPENTER (FORM WORK ONLY) (MECOSTA & OSCEOLA COUNTIES)31.5021.1552.65
CARPENTER: FORM WORK ONLY (BRANCH & HILLSDALE COUNTIES)28.2921.4249.71
CARPENTER: FORM WORK ONLY (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES)36.4623.6960.15
CARPENTER: FORM WORK ONLY (SHIAWASSEE COUNTY)36.4623.6960.15
CARPENTER: FORM WORK ONLY (LENAWEE COUNTY)35.4121.0656.47
ELECTRICIAN (HILLSDALE & LENAWEE COUNTIES)48.4017.7966.19
ELECTRICIAN (HURON COUNTY)51.3228.5479.86
ELECTRICIAN (MECOSTA COUNTY)36.5225.1561.67
ELECTRICIAN (OSCEOLA COUNTY (TOWNSHIPS OF RICHMOND, HERSEY, EVART & ORIENT))36.5225.1561.67
ELECTRICIAN (BRANCH COUNTY)41.0025.7466.74
ELECTRICIAN (OSCEOLA COUNTY (DOES NOT INCLUDE THE TOWNSHIPS OF EVART, HERSEY, ORIENT AND RICHMOND))36.6223.0559.67
ELECTRICIAN (MIDLAND (TOWNSHIPS OF INGERSOLL, JASPER, MOUNT HALEY AND PORTER) & TUSCOLA (TOWNSHIPS OF ALMER, ARBELA, COLUMBIA, DAYTON, DENMARK, ELKLAND, ELLINGTON, ELMWOOD, FAIRGROVE, FREMONT, GILFORD, INDIANFIELDS, JUNIATA, KINGSTON, KOYLON, NOVESTA, TUSCOLA, VASSAR, WATERTOWN AND WELLS) COUNTIES)40.0029.9569.95
ELECTRICIAN (SHIAWASSEE COUNTY (TOWNSHIPS OF PERRY & WOODHULL))45.0031.3776.37
ELECTRICIAN (ARENAC & GLADWIN COUNTIES)40.0026.5266.52
ELECTRICIAN (MIDLAND (ALL TOWNSHIPS EXCEPT MOUNT HALEY, JASPER, PORTER & INGERSOLL) & TUSCOLA (TOWNSHIPS OF WISNER & AKRON) COUNTIES)35.3122.6857.99
ELECTRICIAN (SHIAWASSEE (ALL TOWNSHIPS EXCEPT PERRY & WOODHULL) & TUSCOLA (TOWNSHIP OF MILLINGTON) COUNTIES)44.8326.9671.79
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR39.9525.2565.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)40.5225.2565.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)41.2525.2566.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)45.9825.2571.23
OPERATING ENGINEERS: GROUP 5 (AREA 2)32.9825.2558.23
OPERATING ENGINEERS: GROUP 4 (AREA 2)41.3225.2566.57
OPERATING ENGINEERS: GROUP 3 (AREA 2)44.0025.2569.25
OPERATING ENGINEERS: GROUP 2 (AREA 2)45.6825.2570.93
OPERATING ENGINEERS: GROUP 1 (AREA 2)48.9825.2574.23
OPERATING ENGINEER: GROUP 5 (AREA 1)32.9825.2558.23
OPERATING ENGINEER: GROUP 4 (AREA 1)41.3225.2566.57
OPERATING ENGINEER: GROUP 3 (AREA 1)44.0025.2569.25
OPERATING ENGINEER: GROUP 2 (AREA 1)45.6825.2570.93
OPERATING ENGINEER: GROUP 1 (AREA 1)48.9825.2574.23
OPERATOR: POWER EQUIPMENT: GROUP 8 OILER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM35.2925.3560.64
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR, BULLDOZER, COMPACTOR, SCRAPER, LOADER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM45.3425.3570.69
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM46.3125.3571.66
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM47.1725.3572.52
OPERATOR: POWER EQUIPMENT: GROUP 4CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM47.9925.3573.34
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM48.2925.3573.64
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM48.7925.3574.14
OPERATOR: POWER EQUIPMENT: GROUP 1 (LENAWEE COUNTY) CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM51.2925.3576.64
IRONWORKER: STRUCTURAL (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES)36.5535.9372.48
IRONWORKER: REINFORCING (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES)36.5533.3769.92
IRONWORKER: STRUCTURAL (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES)36.5534.0470.59
IRONWORKER: REINFORCING (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES)36.5534.0470.59
IRONWORKER, STRUCTURAL AND REINFORCING (LENAWEE COUNTY)35.5029.2064.70
LABORER: (4) GRADE CHECKER (HILLSDALE, LENAWEE, SHIAWASSEE)23.7013.1536.85
LABORER: (1) COMMON OR GENERAL (HILLSDALE, LENAWEE, SHIAWASSEE)23.3913.1536.54
LABORER: COMMON OR GENERAL (BRANCH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION)27.2113.4540.66
LABORER: COMMON OR GENERAL (MECOSTA & OSCEOLA COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)26.7012.9539.65
LABORER: COMMON OR GENERAL (HILLSDALE & LENAWEE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)32.3513.4545.80
LABORER: COMMON OR GENERAL (SHIAWASSEE COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION)29.4616.1145.57
LABORER: COMMON OR GENERAL (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES) EXCLUDES OPEN CUT CONSTRUCTION27.6813.4541.13
CEMENT MASON/CONCRETE FINISHER (MECOSTA & OSCEOLA COUNTIES)22.0212.3834.40
CEMENT MASON/CONCRETE FINISHER (SHIAWASSEE COUNTY)25.5812.8838.46
CEMENT MASON/CONCRETE FINISHER (BRANCH COUNTY)24.6312.8837.51
CEMENT MASON/CONCRETE FINISHER (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES)25.4712.3837.85
CEMENT MASON/CONCRETE FINISHER (HILLSDALE & LENAWEE COUNTIES)27.1916.0043.19
PLUMBER/PIPEFITTER (ARENAC, GLADWIN, HURON (WEST OF M-53), MIDLAND & TUSCOLA COUNTIES)43.5022.1065.60
PLUMBER (HURON COUNTY (EAST OF M-53))35.7735.1370.90
PLUMBER/PIPEFITTER (MECOSTA & OSCEOLA COUNTIES)39.8923.8263.71
PLUMBER/PIPEFITTER (LENAWEE COUNTY (TOWNSHIPS OF CLINTON, MACON & TECUMSEH))44.3123.7068.01
PLUMBER/PIPEFITTER (BRANCH & HILLSDALE COUNTIES)42.2923.9466.23
PLUMBER/PIPEFITTER (LENAWEE COUNTY (REMAINDER OF COUNTY))42.2923.9466.23
PLUMBER/PIPEFITTER (SHIAWASSEE COUNTY)39.8120.9560.76
PIPEFITTER (HURON COUNTY (EAST OF M-53))40.4129.3569.76
TRUCK DRIVER: DUMP TRUCK14.061.2515.31
OPERATOR: ROLLER13.747.9321.67
OPERATOR: GRADER/BLADE15.503.6219.12
OPERATOR: BOBCAT/SKID STEER/SKID LOADER12.986.1219.10
LABORER: PIPELAYER15.283.9919.27
LABORER: MASON TENDER - CEMENT/CONCRETE15.973.5119.48
LABORER: LANDSCAPE10.891.7412.63
CARPENTER, EXCLUDES FORM WORK23.976.2930.26
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY33.550.7534.30
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.