ClassificationBase rateFringeTotal
CARPENTER (FORM WORK ONLY) (MECOSTA & OSCEOLA COUNTIES)31.5021.1552.65
CARPENTER: FORM WORK ONLY (BRANCH & HILLSDALE COUNTIES)28.2921.4249.71
CARPENTER: FORM WORK ONLY (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES)36.4623.6960.15
CARPENTER: FORM WORK ONLY (SHIAWASSEE COUNTY)36.4623.6960.15
CARPENTER: FORM WORK ONLY (LENAWEE COUNTY)35.4121.0656.47
ELECTRICIAN (HILLSDALE & LENAWEE COUNTIES)48.4017.7966.19
ELECTRICIAN (HURON COUNTY)51.3228.5479.86
ELECTRICIAN (MECOSTA COUNTY)36.5225.1561.67
ELECTRICIAN (OSCEOLA COUNTY (TOWNSHIPS OF RICHMOND, HERSEY, EVART & ORIENT))36.5225.1561.67
ELECTRICIAN (BRANCH COUNTY)41.0025.7466.74
ELECTRICIAN (OSCEOLA COUNTY (DOES NOT INCLUDE THE TOWNSHIPS OF EVART, HERSEY, ORIENT AND RICHMOND))36.6223.0559.67
ELECTRICIAN (MIDLAND (TOWNSHIPS OF INGERSOLL, JASPER, MOUNT HALEY AND PORTER) & TUSCOLA (TOWNSHIPS OF ALMER, ARBELA, COLUMBIA, DAYTON, DENMARK, ELKLAND, ELLINGTON, ELMWOOD, FAIRGROVE, FREMONT, GILFORD, INDIANFIELDS, JUNIATA, KINGSTON, KOYLON, NOVESTA, TUSCOLA, VASSAR, WATERTOWN AND WELLS) COUNTIES)40.0029.9569.95
ELECTRICIAN (SHIAWASSEE COUNTY (TOWNSHIPS OF PERRY & WOODHULL))45.0031.3776.37
ELECTRICIAN (ARENAC & GLADWIN COUNTIES)40.0026.5266.52
ELECTRICIAN (MIDLAND (ALL TOWNSHIPS EXCEPT MOUNT HALEY, JASPER, PORTER & INGERSOLL) & TUSCOLA (TOWNSHIPS OF WISNER & AKRON) COUNTIES)35.3122.6857.99
ELECTRICIAN (SHIAWASSEE (ALL TOWNSHIPS EXCEPT PERRY & WOODHULL) & TUSCOLA (TOWNSHIP OF MILLINGTON) COUNTIES)44.8326.9671.79
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR39.9525.2565.20
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)40.5225.2565.77
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)41.2525.2566.50
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, SCRAPER, LOADER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)45.9825.2571.23
OPERATING ENGINEERS: GROUP 5 (AREA 2)32.9825.2558.23
OPERATING ENGINEERS: GROUP 4 (AREA 2)41.3225.2566.57
OPERATING ENGINEERS: GROUP 3 (AREA 2)44.0025.2569.25
OPERATING ENGINEERS: GROUP 2 (AREA 2)45.6825.2570.93
OPERATING ENGINEERS: GROUP 1 (AREA 2)48.9825.2574.23
OPERATING ENGINEER: GROUP 5 (AREA 1)32.9825.2558.23
OPERATING ENGINEER: GROUP 4 (AREA 1)41.3225.2566.57
OPERATING ENGINEER: GROUP 3 (AREA 1)44.0025.2569.25
OPERATING ENGINEER: GROUP 2 (AREA 1)45.6825.2570.93
OPERATING ENGINEER: GROUP 1 (AREA 1)48.9825.2574.23
OPERATOR: POWER EQUIPMENT: GROUP 8 OILER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM35.2925.3560.64
OPERATOR: POWER EQUIPMENT: GROUP 7 BACKHOE/EXCAVATOR, BULLDOZER, COMPACTOR, SCRAPER, LOADER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM45.3425.3570.69
OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM46.3125.3571.66
OPERATOR: POWER EQUIPMENT: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM47.1725.3572.52
OPERATOR: POWER EQUIPMENT: GROUP 4CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM47.9925.3573.34
OPERATOR: POWER EQUIPMENT: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM48.2925.3573.64
OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM48.7925.3574.14
OPERATOR: POWER EQUIPMENT: GROUP 1 (LENAWEE COUNTY) CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER (LENAWEE COUNTY) FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM51.2925.3576.64
IRONWORKER: STRUCTURAL (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES)36.5535.9372.48
IRONWORKER: REINFORCING (ARENAC, GLADWIN, HURON, MIDLAND, SHIAWASSEE & TUSCOLA COUNTIES)36.5533.3769.92
IRONWORKER: STRUCTURAL (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES)36.5534.0470.59
IRONWORKER: REINFORCING (BRANCH, HILLSDALE, MECOSTA & OSCEOLA COUNTIES)36.5534.0470.59
IRONWORKER, STRUCTURAL AND REINFORCING (LENAWEE COUNTY)35.5029.2064.70
LABORER: (4) GRADE CHECKER (HILLSDALE, LENAWEE, SHIAWASSEE)23.7013.1536.85
LABORER: (1) COMMON OR GENERAL (HILLSDALE, LENAWEE, SHIAWASSEE)23.3913.1536.54
LABORER: COMMON OR GENERAL (BRANCH COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION)27.2113.4540.66
LABORER: COMMON OR GENERAL (MECOSTA & OSCEOLA COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)26.7012.9539.65
LABORER: COMMON OR GENERAL (HILLSDALE & LENAWEE COUNTIES) (EXCLUDES OPEN CUT CONSTRUCTION)32.3513.4545.80
LABORER: COMMON OR GENERAL (SHIAWASSEE COUNTY) (EXCLUDES OPEN CUT CONSTRUCTION)29.4616.1145.57
LABORER: COMMON OR GENERAL (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES) EXCLUDES OPEN CUT CONSTRUCTION27.6813.4541.13
CEMENT MASON/CONCRETE FINISHER (MECOSTA & OSCEOLA COUNTIES)22.0212.3834.40
CEMENT MASON/CONCRETE FINISHER (SHIAWASSEE COUNTY)25.5812.8838.46
CEMENT MASON/CONCRETE FINISHER (BRANCH COUNTY)24.6312.8837.51
CEMENT MASON/CONCRETE FINISHER (ARENAC, GLADWIN, HURON, MIDLAND & TUSCOLA COUNTIES)25.4712.3837.85
CEMENT MASON/CONCRETE FINISHER (HILLSDALE & LENAWEE COUNTIES)27.1916.0043.19
PLUMBER/PIPEFITTER (ARENAC, GLADWIN, HURON (WEST OF M-53), MIDLAND & TUSCOLA COUNTIES)43.5022.1065.60
PLUMBER (HURON COUNTY (EAST OF M-53))35.7735.1370.90
PLUMBER/PIPEFITTER (MECOSTA & OSCEOLA COUNTIES)39.8923.8263.71
PLUMBER/PIPEFITTER (LENAWEE COUNTY (TOWNSHIPS OF CLINTON, MACON & TECUMSEH))44.3123.7068.01
PLUMBER/PIPEFITTER (BRANCH & HILLSDALE COUNTIES)42.2923.9466.23
PLUMBER/PIPEFITTER (LENAWEE COUNTY (REMAINDER OF COUNTY))42.2923.9466.23
PLUMBER/PIPEFITTER (SHIAWASSEE COUNTY)39.8120.9560.76
PIPEFITTER (HURON COUNTY (EAST OF M-53))40.4129.3569.76
TRUCK DRIVER: DUMP TRUCK14.061.2515.31
OPERATOR: ROLLER13.747.9321.67
OPERATOR: GRADER/BLADE15.503.6219.12
OPERATOR: BOBCAT/SKID STEER/SKID LOADER12.986.1219.10
LABORER: PIPELAYER15.283.9919.27
LABORER: MASON TENDER - CEMENT/CONCRETE15.973.5119.48
LABORER: LANDSCAPE10.891.7412.63
CARPENTER, EXCLUDES FORM WORK23.976.2930.26
TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY33.550.7534.30
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.