Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 37.00 | 23.85 | 60.85 |
| BOILERMAKER | 43.50 | 37.64 | 81.14 |
| TILE SETTER | 40.53 | 23.62 | 64.15 |
| TILE FINISHER | 33.50 | 23.52 | 57.02 |
| BRICKLAYER | 41.66 | 26.53 | 68.19 |
| CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION; DRYWALL HANGING, FINISHING/TAPING; FORM WORK; METAL STUD INSTALLATION; & SCAFFOLD BUILDING) | 42.44 | 31.43 | 73.87 |
| MILLWRIGHT | 42.92 | 39.13 | 82.05 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | 48.40 | 17.79 | 66.19 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 35.29 | 25.35 | 60.64 |
| STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 43.63 | 25.35 | 68.98 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 45.34 | 25.35 | 70.69 |
| FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL. DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 46.31 | 25.35 | 71.66 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.17 | 25.35 | 72.52 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 47.99 | 25.35 | 73.34 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 48.29 | 25.35 | 73.64 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 48.79 | 25.35 | 74.14 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL DERRICK AND CRANES WHERE THE OPERATOR MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL TO THE APPLICABLE CRANE OPERATOR RATE | 51.29 | 25.35 | 76.64 |
| IRONWORKER: REINFORCING & STRUCTURAL | 35.50 | 29.20 | 64.70 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | 27.71 | 9.10 | 36.81 |
| LABORER: LANDSCAPE & IRRIGATION: GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER, SKIDSTEER (OR EQUIVALENT) | 29.93 | 9.10 | 39.03 |
| LABORER: MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE | 38.80 | 15.70 | 54.50 |
| LABORER: COMMON OR GENERAL; GRADE CHECKER; SANDBLASTER | 38.58 | 15.70 | 54.28 |
| PAINTER: SPRAY | 26.86 | 17.66 | 44.52 |
| PAINTER: BRUSH AND ROLLER | 32.85 | 20.41 | 53.26 |
| GLAZIER PAID HOLIDAYS: NEW YEAR'S DAY, DECORATION DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE EMPLOYEE HAS WORKED THE LAST FULL REGULAR SCHEDULED WORK DAY PRIOR TO THE HOLIDAY, AND THE FIRST FULL REGULAR SCHEDULED WORK DAY FOLLOWING THE HOLIDAY, PROVIDED THE EMPLOYEE IS PHYSICALLY ABLE TO WORK | 42.00 | 25.55 | 67.55 |
| CEMENT MASON/CONCRETE FINISHER | 30.63 | 14.07 | 44.70 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION | 46.71 | 26.79 | 73.50 |
| PIPEFITTER (INCLUDING HVAC PIPE INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | 46.71 | 26.79 | 73.50 |
| ROOFER | 30.73 | 26.82 | 57.55 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 30.80 | 21.51 | 52.31 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | 13.57 | 1.18 | 14.75 |
| IRONWORKER, ORNAMENTAL | 18.48 | 7.93 | 26.41 |
| TRUCK DRIVER: GROUP 3 LOWBOY PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME. FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.28 | 0.70 | 31.98 |
| MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.18 | 0.70 | 31.88 |
| $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.03 | 0.70 | 31.73 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (SINGLE-FAMILY HOMES AND DETATCHED CONDOMINIUMS) | 29.19 | 15.76 | 44.95 |
| CARPENTER (MULTI-FAMILY CONDOMINIUMS) | 31.58 | 16.27 | 47.85 |
| ELECTRICIAN | 30.31 | 13.18 | 43.49 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 45.34 | 25.35 | 70.69 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM. IF THE WORKER MUST CLIMB 50 FT. OR MORE TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 46.31 | 25.35 | 71.66 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 47.17 | 25.35 | 72.52 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 47.99 | 25.35 | 73.34 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 48.29 | 25.35 | 73.64 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 49.79 | 25.35 | 75.14 |
| TO THE WORK STATION, $.25 PER HOUR ADDITIONAL | 51.29 | 25.35 | 76.64 |
| IRONWORKER, STRUCTURAL | 35.49 | 29.20 | 64.69 |
| LANDSCAPE LABORER: GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | 27.71 | 9.10 | 36.81 |
| LABORER: COMMON OR GENERAL | 38.58 | 15.70 | 54.28 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | 38.80 | 15.70 | 54.50 |
| PAINTER: BRUSH AND ROLLER | 20.14 | 14.72 | 34.86 |
| PLUMBER (EXCLUDING HVAC PIPE INSTALLATION) | 31.37 | 14.91 | 46.28 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 31.37 | 14.91 | 46.28 |
| ROOFER | 30.73 | 26.82 | 57.55 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 17.21 | 9.99 | 27.20 |
| TRUCK DRIVER: DUMP TRUCK | 17.00 | 5.71 | 22.71 |
| LABORER: PIPELAYER | 17.99 | 5.46 | 23.45 |
| CEMENT MASON/CONCRETE FINISHER | 19.27 | 5.85 | 25.12 |
| TRUCK DRIVER: PICKUP PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THE ABOVE HOLIDAYS FALL ON A SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED THE HOLIDAY AND, IF WORK IS PERFORMED, THE RATE SHALL BE DOUBLE TIME FOOTNOTE: A. $456.70 PER WEEK, PLUS $67.10 PER DAY | 31.03 | 0.70 | 31.73 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | 42.44 | 31.43 | 73.87 |
| ELECTRICIAN | 48.40 | 17.79 | 66.19 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | 39.95 | 25.25 | 65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | 40.52 | 25.25 | 65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | 41.25 | 25.25 | 66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT DIGGING CAPACITY) | 45.98 | 25.25 | 71.23 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 9 OILER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 35.29 | 25.35 | 60.64 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 8 FORKLIFT FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 43.63 | 25.35 | 68.98 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 BACKHOE/EXCAVATOR, BOBCAT/SKID LOADER, BORING MACHINE, BROOM/SWEEPER, BULLDOZER, GRADER/BLADE, LOADER, ROLLER, SCRAPER, TRACTOR, TRENCHER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 45.34 | 25.35 | 70.69 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 REGULAR CRANE OPERATOR FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 46.31 | 25.35 | 71.66 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 CRANE WITH BOOM & JIB OR LEADS 120' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 47.17 | 25.35 | 72.52 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 CRANE WITH BOOM & JIB OR LEADS 140' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 47.99 | 25.35 | 73.34 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 CRANE WITH BOOM & JIB OR LEADS 220' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 48.29 | 25.35 | 73.64 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE WITH BOOM & JIB OR LEADS 300' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 49.79 | 25.35 | 75.14 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE WITH BOOM & JIB OR LEADS 400' OR LONGER FOOTNOTES: TOWER CRANES: TO BE PAID THE CRANE OPERATOR RATE DETERMINED BY THE COMBINED LENGTH OF THE MAST AND THE BOOM | 51.29 | 25.35 | 76.64 |
| IRONWORKER: STRUCTURAL AND REINFORCING | 35.50 | 29.20 | 64.70 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 2 LANDSCAPE LABORER: SMALL POWER TOOL OPERATOR, MATERIAL MOVER, TRUCK DRIVER AND LAWN SPRINKLER INSTALLER TENDER | 27.71 | 9.10 | 36.81 |
| LANDSCAPE LABORER, EXCLUDES OPEN CUT CONSTRUCTION GROUP 1 LANDSCAPE SPECIALIST, INCLUDING AIR, GAS AND DIESEL EQUIPMENT OPERATOR, LAWN SPRINKLER INSTALLER AND SKIDSTEER (OR EQUIVALENT) | 29.93 | 9.10 | 39.03 |
| LABORER ((7) LANDSCAPE) | 19.59 | 12.95 | 32.54 |
| LABORER ((524.20) PIPELAYER) | 25.65 | 12.95 | 38.60 |
| LABORER ((4) GRADE CHECKER) | 25.50 | 12.95 | 38.45 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | 22.11 | 12.95 | 35.06 |
| LABORER ((1) COMMON OR GENERAL) | 25.20 | 12.95 | 38.15 |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 2 MASON TENDER - CEMENT/CONCRETE | 38.80 | 15.70 | 54.50 |
| LABORER, EXCLUDES OPEN CUT CONSTRUCTION: GROUP 1 COMMON OR GENERAL; GRADE CHECKER | 38.58 | 15.70 | 54.28 |
| PAINTER: SPRAY | 25.86 | 14.75 | 40.61 |
| PAINTER: BRUSH & ROLLER | 25.06 | 14.75 | 39.81 |
| CEMENT MASON/CONCRETE FINISHER | 27.19 | 16.00 | 43.19 |
| PLUMBER | 43.79 | 23.94 | 67.73 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | 20.82 | 3.69 | 24.51 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | 33.65 | 0.75 | 34.40 |
| TRUCK DRIVER: DUMP TRUCK, 8 CU. YDS. AND OVER | 33.50 | 0.75 | 34.25 |
| TRUCK DRIVER: DUMP TRUCK UNDER 8 CU. YDS.; TRACTOR HAUL TRUCK FOOTNOTE: A. $470.70 PER WEEK. B $68.70 DAILY | 33.40 | 0.75 | 34.15 |