| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 37.20 | — | 37.20 |
| BOILERMAKER | 43.50 | 36.74 | 80.24 |
| TILE SETTER | 27.35 | 22.20 | 49.55 |
| TILE FINISHER | 26.24 | 21.13 | 47.37 |
| BRICKLAYER | 35.21 | 24.26 | 59.47 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | 28.29 | 21.42 | 49.71 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | 46.00 | 29.23 | 75.23 |
| OPERATOR: POWER EQUIPMENT: GROUP 7 OILER FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 31.23 | 25.25 | 56.48 |
| OPERATOR: POWER EQUIPMENT: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 33.37 | 25.25 | 58.62 |
| DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 39.57 | 25.25 | 64.82 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BACKHOE/EXCAVATOR/TRACKHOE; CRANE; CONCRETE PUMP; GRADER/BLADE; HIGHLIFT; HOIST; LOADER; ROLLER; SCRAPER; STIFF LEG DERRICK; TRENCHER FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 42.25 | 25.25 | 67.50 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 43.93 | 25.25 | 69.18 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 47.28 | 25.25 | 72.53 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 31.75 | 22.84 | 54.59 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - BRICK; MASON TENDER - CEMENT/CONCRETE; SANDBLASTER) | 27.21 | 13.45 | 40.66 |
| PAINTER: SPRAY | 27.32 | 16.46 | 43.78 |
| PAINTER: BRUSH AND ROLLER | 27.32 | 16.66 | 43.98 |
| GLAZIER | 31.22 | 21.57 | 52.79 |
| CEMENT MASON/CONCRETE FINISHER | 24.63 | 12.88 | 37.51 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (CITY OF NILES & VICINITY) | 33.60 | 19.36 | 52.96 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION (CITY OF NILES & VICINITY) | 33.60 | 19.36 | 52.96 |
| PLUMBER, EXCLUDES HVAC PIPE AND UNIT INSTALLATION (NOT INCLUDING THE DONALD C. COOK NUCLEAR GENERATING PLANT & CITY OF NILES AND VICINITY) | 32.50 | 24.97 | 57.47 |
| PIPEFITTER, INCLUDES HVAC PIPE AND UNIT INSTALLATION (NOT INCLUDING THE DONALD C. COOK NUCLEAR GENERATING PLANT & CITY OF NILES AND VICINITY) | 32.50 | 24.97 | 57.47 |
| ROOFER: COMPOSITION | 34.55 | 21.04 | 55.59 |
| ROOFER (SLATE & TILE) | 36.05 | 21.04 | 57.09 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION; EXCLUDING HVAC SYSTEM INSTALLATION) | 44.45 | 30.43 | 74.88 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK | 13.57 | 1.18 | 14.75 |
| TRUCK DRIVER: LOWBOY TRUCK | 14.50 | 0.44 | 14.94 |
| TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | 17.26 | 11.42 | 28.68 |
| OPERATOR: TRACTOR | 19.10 | 8.48 | 27.58 |
| OPERATOR: BULLDOZER | 19.68 | 6.64 | 26.32 |
| LABORER: LANDSCAPE & IRRIGATION | 10.38 | 0.50 | 10.88 |
| IRONWORKER, ORNAMENTAL | 18.48 | 7.93 | 26.41 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 27.00 | 18.29 | 45.29 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 44.00 | 25.25 | 69.25 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 45.68 | 25.25 | 70.93 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 48.98 | 25.25 | 74.23 |
| IRONWORKER, STRUCTURAL | 31.75 | 22.84 | 54.59 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 27.21 | 13.45 | 40.66 |
| PAINTER: BRUSH AND ROLLER | 21.75 | 11.94 | 33.69 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (BERRIEN (CITY OF NILES & VICINITY) & CASS COUNTIES) | 20.96 | 19.18 | 40.14 |
| ROOFER: COMPOSITION | 34.55 | 21.04 | 55.59 |
| ROOFER (SLATE & TILE) | 36.05 | 21.04 | 57.09 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 44.45 | 30.43 | 74.88 |
| TRUCK DRIVER: DUMP TRUCK | 17.00 | 5.71 | 22.71 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 26.17 | 7.55 | 33.72 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 17.66 | 7.65 | 25.31 |
| OPERATOR: BACKHOE/EXCAVATOR | 19.94 | 5.46 | 25.40 |
| LABORER: PIPELAYER | 17.95 | 5.46 | 23.41 |
| LABORER: LANDSCAPE | 9.64 | 2.81 | 12.45 |
| LABORER: COMMON OR GENERAL | 16.87 | 5.46 | 22.33 |
| CEMENT MASON/CONCRETE FINISHER | 19.27 | 5.85 | 25.12 |
| CARPENTER | 18.81 | 6.38 | 25.19 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER, INCLUDES FORM WORK | 28.29 | 21.42 | 49.71 |
| ELECTRICIAN | 46.00 | 29.23 | 75.23 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER | 39.95 | 25.25 | 65.20 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM) | 40.52 | 25.25 | 65.77 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER) | 41.25 | 25.25 | 66.50 |
| POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT DIGGING CAPACITY) | 45.98 | 25.25 | 71.23 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 7 OILER PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | 32.98 | 25.25 | 58.23 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 6 FORK TRUCK (20' LIFT AND UNDER FOR MASONRY WORK) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | 35.46 | 25.25 | 60.71 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 5 BOOM TRUCK (NON-SWINGING) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | 41.32 | 25.25 | 66.57 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 4 BOBCAT/SKID LOADER; BROOM/SWEEPER; FORK TRUCK (OVER 20' LIFT) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | 41.32 | 25.25 | 66.57 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 3 BACKHOE/EXCAVATOR; BORING MACHINE; BULLDOZER; CRANE; GRADER/BLADE; LOADER; ROLLER; SCRAPER; TRACTOR; TRENCHER PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | 44.00 | 25.25 | 69.25 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. FOOTNOTES CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | 45.68 | 25.25 | 70.93 |
| OPERATOR: POWER EQUIPMENT, EXCLUDES UNDERGROUND CONSTRUCTION: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF ULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE | 48.98 | 25.25 | 74.23 |
| IRONWORKER: STRUCTURAL AND REINFORCING | 31.75 | 22.84 | 54.59 |
| LABORER ((5) PIPELAYER) | 22.85 | 12.95 | 35.80 |
| LABORER ((4) GRADE CHECKER) | 22.73 | 12.95 | 35.68 |
| LABORER ((2) MASON TENDER-CEMENT/CONCRETE) | 22.55 | 12.95 | 35.50 |
| LABORER ((1) COMMON OR GENERAL) | 22.42 | 12.95 | 35.37 |
| LABORER (COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE) (EXCLUDES OPEN CUT CONSTRUCTION) | 27.21 | 13.45 | 40.66 |
| PAINTER: SPRAY | 22.75 | 11.94 | 34.69 |
| PAINTER: BRUSH & ROLLER | 21.75 | 11.94 | 33.69 |
| CEMENT MASON/CONCRETE FINISHER | 24.63 | 12.88 | 37.51 |
| PLUMBER (CITY OF NILES & VICINITY) | 33.60 | 19.36 | 52.96 |
| PLUMBER | 35.20 | 22.35 | 57.55 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | 20.82 | 3.69 | 24.51 |
| TRUCK DRIVER: DUMP TRUCK | 18.00 | 6.43 | 24.43 |
| LABORER: LANDSCAPE | 12.25 | — | 12.25 |
| TRUCK DRIVER: TRACTOR HAUL TRUCK FOOTNOTE: A $470.70 PER WEEK. B. $68.70 DAILY | 33.30 | 0.75 | 34.05 |
| TRUCK DRIVER: LOWBOY/SEMI-TRAILER TRUCK FOOTNOTE: A. $470.70 PER WEEK. B. $68.70 DAILY | 33.55 | 0.75 | 34.30 |