Residential Published 05/18/2026. 20 classifications. Covers 2 counties: Berrien, Cass
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 27.00 | 18.29 | 45.29 |
| OPERATOR: POWER EQUIPMENT: GROUP 3 BULLDOZER; CRANE; GRADER/BLADE; LOADER; SCRAPER; STIFF LEG DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 44.00 | 25.25 | 69.25 |
| OPERATOR: POWER EQUIPMENT: GROUP 2 CRANE OPERATOR WITH MAIN BOOM AND JIB 140' OR LONGER, TOWER CRANE, GANTRY CRANE, WHIRLEY DERRICK FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 45.68 | 25.25 | 70.93 |
| OPERATOR: POWER EQUIPMENT: GROUP 1 CRANE OPERATOR WITH MAIN BOOM AND JIB 400', 300', OR 220' OR LONGER. FOOTNOTES: CRANE OPERATOR WITH MAIN BOOM AND JIB 300' OR LONGER: $1.50 PER HOUR ABOVE THE GROUP 1 RATE. CRANE OPERATOR WITH MAIN BOOM AND JIB 400' OR LONGER: $3.00 PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY | 48.98 | 25.25 | 74.23 |
| IRONWORKER, STRUCTURAL | 31.75 | 22.84 | 54.59 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 27.21 | 13.45 | 40.66 |
| PAINTER: BRUSH AND ROLLER | 21.75 | 11.94 | 33.69 |
| PIPEFITTER: HVAC PIPE INSTALLATION ONLY (BERRIEN (CITY OF NILES & VICINITY) & CASS COUNTIES) | 20.96 | 19.18 | 40.14 |
| ROOFER: COMPOSITION | 34.55 | 21.04 | 55.59 |
| ROOFER (SLATE & TILE) | 36.05 | 21.04 | 57.09 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | 44.45 | 30.43 | 74.88 |
| TRUCK DRIVER: DUMP TRUCK | 17.00 | 5.71 | 22.71 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 26.17 | 7.55 | 33.72 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 17.66 | 7.65 | 25.31 |
| OPERATOR: BACKHOE/EXCAVATOR | 19.94 | 5.46 | 25.40 |
| LABORER: PIPELAYER | 17.95 | 5.46 | 23.41 |
| LABORER: LANDSCAPE | 9.64 | 2.81 | 12.45 |
| LABORER: COMMON OR GENERAL | 16.87 | 5.46 | 22.33 |
| CEMENT MASON/CONCRETE FINISHER | 19.27 | 5.85 | 25.12 |
| CARPENTER | 18.81 | 6.38 | 25.19 |