| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 32.66 | 9.86 | 42.52 |
| ELECTRICIAN (INCLUDING COMMUNICATION TECHNICIAN AND LOW VOLTAGE WIRING) | 36.00 | 16.66 | 52.66 |
| ELEVATOR MECHANIC A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. B. VACATION EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR UNDER 5 YEARS OF SERVICE AS VACATION PAY CREDIT | 51.11 | 38.44 | 89.55 |
| POWER EQUIPMENT OPERATOR: CRANE CRANE PREMIUMS 50-150 TONS $1.75 OVER 150 TONS $2.25 | 23.46 | 8.35 | 31.81 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | 34.75 | 13.86 | 48.61 |
| GLAZIER | 25.44 | 12.20 | 37.64 |
| CEMENT MASON/CONCRETE FINISHER | 30.47 | 7.97 | 38.44 |
| PLUMBER (INSTALLATION OF HVAC TEMPERATURE CONTROLS; EXCLUDING HVAC PIPE AND UNIT INSTALLATION) | 33.30 | 14.98 | 48.28 |
| PIPEFITTER (INCLUDING HVAC PIPE AND UNIT INSTALLATION; EXCLUDING INSTALLATION OF HVAC TEMPERATURE CONTROLS) | 34.87 | 17.79 | 52.66 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 26.71 | 11.93 | 38.64 |
| TRUCK DRIVER: DUMP TRUCK | 15.00 | — | 15.00 |
| TILE SETTER | 20.00 | — | 20.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 20.98 | 5.46 | 26.44 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 20.66 0.00 ROOFER | 16.77 | 5.66 | 22.43 |
| PAINTER: DRYWALL FINISHING/TAPING | 18.63 | 3.43 | 22.06 |
| PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING | 18.95 | 8.91 | 27.86 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 21.03 | — | 21.03 |
| LABORER: MASON TENDER - BRICK | 12.39 | — | 12.39 |
| LABORER: COMMON OR GENERAL | 13.28 | — | 13.28 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 18.35 | 4.33 | 22.68 |
| CARPENTER, EXCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND FORM WORK | 19.25 | 2.73 | 21.98 |
| CARPENTER (FORM WORK ONLY) | 15.00 | — | 15.00 |
| BRICKLAYER | 18.88 | — | 18.88 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (INCLUDES FORM WORK) | 32.59 | 10.52 | 43.11 |
| MECHANIC | 25.40 | 8.05 | 33.45 |
| LABORER: COMMON OR GENERAL (ORLEANS, JEFFERSON AND ST. BERNARD PARISHES) | 22.28 | 4.81 | 27.09 |
| LABORER: COMMON OR GENERAL (PLAQUEMINES, ST.CHARLES AND ST. JOHN THE BAPTIST PARISHES) | 18.96 | 4.81 | 23.77 |
| TRUCK DRIVERS: WATER TRUCK | 13.79 | — | 13.79 |
| TRUCK DRIVERS: DUMP TRUCK | 12.93 | 0.18 | 13.11 |
| POWER EQUIPMENT OPERATORS: TRENCHER | 14.38 | — | 14.38 |
| POWER EQUIPMENT OPERATORS: ROLLER (DIRT AND GRADE COMPACTION) (ORLEANS, PLAQUEMINES, ST. TAMMANY) | 14.74 | 4.23 | 18.97 |
| POWER EQUIPMENT OPERATORS: ROLLER (DIRT AND GRADE COMPACTION) (JEFFERSON, ST. BERNARD, ST. CHARLES AND ST. JOHN THE BAPTIST) | 12.59 | 4.37 | 16.96 |
| POWER EQUIPMENT OPERATORS: MILLING MACHINE | 16.63 | 2.14 | 18.77 |
| POWER EQUIPMENT OPERATORS: GRADER/BLADE | 15.88 | — | 15.88 |
| POWER EQUIPMENT OPERATORS: CRANE | 25.35 | — | 25.35 |
| POWER EQUIPMENT OPERATORS: BULLDOZER | 16.40 | — | 16.40 |
| POWER EQUIPMENT OPERATORS: BROOM/SWEEPER | 15.17 | 5.15 | 20.32 |
| POWER EQUIPMENT OPERATORS BACKHOE/EXCAVATOR/TRACKHOE | 16.85 | 4.91 | 21.76 |
| POWER EQUIPMENT OPERATORS: ASPHALT PAVER | 17.20 | 4.97 | 22.17 |
| LABORER: COMMON OR GENERAL (ST. TAMMANY COUNTY) | 9.51 | 1.14 | 10.65 |
| IRONWORKER, REINFORCING | 17.49 | — | 17.49 |
| CEMENT MASON/CONCRETE FINISHER | 20.03 | 4.24 | 24.27 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | 40.34 | 14.16 | 54.50 |
| CARPENTER (FORMBUILDING/FORMSETTING AND PILEDRIVERS) | 32.59 | 10.52 | 43.11 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST CHARLES, ST. JAMES, AND ST. JOHN THE BAPTIST PARISHES) | 36.00 | 16.66 | 52.66 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (ST TAMMANY PARISH) | 30.35 | 12.46 | 42.81 |
| OPERATOR: POWER EQUIPMENT: MECHANIC | 23.31 | 6.70 | 30.01 |
| OPERATOR: POWER EQUIPMENT: BULLDOZER | 21.26 | 6.70 | 27.96 |
| CEMENT MASON/CONCRETE FINISHER (JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST. JOHN THE BAPTIST, AND ST. TAMMANY PARISHES) | 30.47 | 7.97 | 38.44 |
| CEMENT MASON/CONCRETE FINISHER (ST. JAMES PARISH) | 31.83 | 5.90 | 37.73 |
| PLUMBERS: EXCLUDING PIPE LAYING (JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST JAMES (SOUTHEASTERN PORTION), ST. JOHN THE BAPTIST, AND ST. TAMMANY PARISHES) | 31.70 | 13.85 | 45.55 |
| PLUMBER: EXCLUDING PIPE LAYING (ST. JAMES PARISH (NORTHWESTERN PORTION)) | 32.42 | 16.50 | 48.92 |
| TRUCK DRIVERS: PICKUP | 12.25 | — | 12.25 |
| TRUCK DRIVERS: DUMP | 11.01 | — | 11.01 |
| POWER EQUIPMENT OPERATORS: OILER | 10.03 | — | 10.03 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | 13.89 | — | 13.89 |
| POWER EQUIPMENT OPERATORS: DRAGLINE | 16.50 | — | 16.50 |
| POWER EQUIPMENT OPERATORS: CRANE | 16.34 | 3.30 | 19.64 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR | 14.42 | — | 14.42 |
| PIPEFITTER (EXCLUDING PIPELAYING) | 17.52 | 4.51 | 22.03 |
| LABORERS: MASON TENDER | 7.25 | — | 7.25 |
| LABORERS: FLAGGER | 8.58 | — | 8.58 |
| LABORERS: FENCE | 11.24 | — | 11.24 |
| LABORERS: COMMON/LANDSCAPE | 9.88 | — | 9.88 |
| LABORERS: (PIPELAYER) | 9.84 | — | 9.84 |
| CARPENTER (ALL OTHER WORK) | 13.75 | 2.60 | 16.35 |