Heavy Published 05/18/2026. 24 classifications. Covers 8 counties: Jefferson, Orleans, Plaquemines, St Bernard, St Charles, St James, St John the Baptist, St Tammany
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| MILLWRIGHT | 40.34 | 14.16 | 54.50 |
| CARPENTER (FORMBUILDING/FORMSETTING AND PILEDRIVERS) | 32.59 | 10.52 | 43.11 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST CHARLES, ST. JAMES, AND ST. JOHN THE BAPTIST PARISHES) | 36.00 | 16.66 | 52.66 |
| ELECTRICIAN: INCLUDING LOW VOLTAGE WIRING (ST TAMMANY PARISH) | 30.35 | 12.46 | 42.81 |
| OPERATOR: POWER EQUIPMENT: MECHANIC | 23.31 | 6.70 | 30.01 |
| OPERATOR: POWER EQUIPMENT: BULLDOZER | 21.26 | 6.70 | 27.96 |
| CEMENT MASON/CONCRETE FINISHER (JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST. JOHN THE BAPTIST, AND ST. TAMMANY PARISHES) | 30.47 | 7.97 | 38.44 |
| CEMENT MASON/CONCRETE FINISHER (ST. JAMES PARISH) | 31.83 | 5.90 | 37.73 |
| PLUMBERS: EXCLUDING PIPE LAYING (JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST JAMES (SOUTHEASTERN PORTION), ST. JOHN THE BAPTIST, AND ST. TAMMANY PARISHES) | 31.70 | 13.85 | 45.55 |
| PLUMBER: EXCLUDING PIPE LAYING (ST. JAMES PARISH (NORTHWESTERN PORTION)) | 32.42 | 16.50 | 48.92 |
| TRUCK DRIVERS: PICKUP | 12.25 | — | 12.25 |
| TRUCK DRIVERS: DUMP | 11.01 | — | 11.01 |
| POWER EQUIPMENT OPERATORS: OILER | 10.03 | — | 10.03 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | 13.89 | — | 13.89 |
| POWER EQUIPMENT OPERATORS: DRAGLINE | 16.50 | — | 16.50 |
| POWER EQUIPMENT OPERATORS: CRANE | 16.34 | 3.30 | 19.64 |
| POWER EQUIPMENT OPERATORS: BACKHOE/EXCAVATOR | 14.42 | — | 14.42 |
| PIPEFITTER (EXCLUDING PIPELAYING) | 17.52 | 4.51 | 22.03 |
| LABORERS: MASON TENDER | 7.25 | — | 7.25 |
| LABORERS: FLAGGER | 8.58 | — | 8.58 |
| LABORERS: FENCE | 11.24 | — | 11.24 |
| LABORERS: COMMON/LANDSCAPE | 9.88 | — | 9.88 |
| LABORERS: (PIPELAYER) | 9.84 | — | 9.84 |
| CARPENTER (ALL OTHER WORK) | 13.75 | 2.60 | 16.35 |