Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 47.67 | 28.38 | 76.05 |
| BRICKLAYER | 32.05 | 18.27 | 50.32 |
| CARPENTER (INCLUDES FORM WORK AND SCAFFOLD BUILDING, EXCLUDES ACOUSTICAL CEILING INSTALLATION AND DRYWALL HANGING)) | 33.41 | 17.84 | 51.25 |
| ELECTRICIAN | 49.55 | 19.09 | 68.64 |
| ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY | 67.61 | 38.44 | 106.05 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 43.40 | 30.27 | 73.67 |
| LABORER: COMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | 32.15 | 16.30 | 48.45 |
| LABORER (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD)) | 26.84 | 12.35 | 39.19 |
| PLUMBER (ZONE 1) | 44.57 | 26.58 | 71.15 |
| ROOFER | 35.75 | 15.21 | 50.96 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 39.00 | 22.42 | 61.42 |
| TRUCK DRIVER: DUMP TRUCK | 17.82 | 2.18 | 20.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY | 19.31 | 4.41 | 23.72 |
| OPERATOR: CRANE | 27.29 | 10.53 | 37.82 |
| OPERATOR: BACKHOE/EXCAVATOR | 20.75 | 4.42 | 25.17 |
| LABORER: CARPENTER TENDER | 17.71 | 1.82 | 19.53 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 20.13 | 1.80 | 21.93 |
| DRYWALL FINISHER/TAPER | 20.27 | 3.50 | 23.77 |
| CEMENT MASON/CONCRETE FINISHER | 26.08 | 9.93 | 36.01 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING ONLY) | 24.69 | 1.62 | 26.31 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | 10.33 | — | 10.33 |
| SHEET METAL WORKER | 10.00 | 1.10 | 11.10 |
| ROOFER | 10.00 | — | 10.00 |
| POWER EQUIPMENT OPERATORS: PAVER; BLADE, SCREED AND ROLLER (ASPHALT) | 8.00 | — | 8.00 |
| POWER EQUIPMENT OPERATORS: FRONT END LOADER | 8.75 | — | 8.75 |
| POWER EQUIPMENT OPERATORS: (BACKHOE) | 8.34 | — | 8.34 |
| PLUMBER | 8.50 | — | 8.50 |
| PAINTER | 8.00 | — | 8.00 |
| LABORER | 7.25 | — | 7.25 |
| ELECTRICIAN | 9.18 | — | 9.18 |
| CARPENTER | 8.30 | — | 8.30 |
| BRICKLAYER | 11.86 | — | 11.86 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| LABORER: MASON TENDER (CEMENT/CONCRETE) | 28.21 | 13.00 | 41.21 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | 40.89 | 18.64 | 59.53 |
| TRUCK DRIVER: WATER TRUCK | 23.12 | 10.75 | 33.87 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | 22.54 | 12.35 | 34.89 |
| TRUCK DRIVER: LOWBOY TRUCK | 22.12 | 13.20 | 35.32 |
| TRUCK DRIVER: DUMP TRUCK | 23.40 | 10.75 | 34.15 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 22.66 | 10.90 | 33.56 |
| TRAFFIC CONTROL: FLAGGER | 21.46 | 10.12 | 31.58 |
| OPERATOR: SCREED | 25.71 | 11.55 | 37.26 |
| OPERATOR: ROTOMILL | 29.78 | 4.52 | 34.30 |
| OPERATOR: ROLLER (SUBGRADE) | 22.24 | 8.57 | 30.81 |
| OPERATOR: ROLLER | 25.49 | 11.55 | 37.04 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 25.66 | 11.03 | 36.69 |
| OPERATOR: OILER | 25.66 | 9.23 | 34.89 |
| OPERATOR: MECHANIC | 26.00 | 9.93 | 35.93 |
| OPERATOR: LOADER | 25.76 | 10.31 | 36.07 |
| OPERATOR: HYDROSEEDER | 24.76 | 11.51 | 36.27 |
| OPERATOR: GRADER/BLADE | 26.00 | 10.30 | 36.30 |
| OPERATOR: CRUSHER | 25.06 | 9.23 | 34.29 |
| OPERATOR: CRANE | 27.18 | 10.97 | 38.15 |
| OPERATOR: BULLDOZER | 25.73 | 11.51 | 37.24 |
| OPERATOR: BROOM/SWEEPER | 26.82 | 11.55 | 38.37 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 25.35 | 11.55 | 36.90 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 25.97 | 10.95 | 36.92 |
| LABORER: GRADE CHECKER | 23.41 | 10.78 | 34.19 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | 23.98 | 11.05 | 35.03 |
| LABORER: COMMON OR GENERAL | 22.92 | 10.01 | 32.93 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 22.86 | 9.40 | 32.26 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 23.80 | 6.67 | 30.47 |
| ELECTRICIAN | 26.83 | 11.94 | 38.77 |
| CARPENTER (FORM WORK ONLY) | 26.57 | 8.10 | 34.67 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (FORM WORK ONLY) | 38.87 | 17.84 | 56.71 |
| ELECTRICIAN | 49.55 | 19.09 | 68.64 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 30.41 | 15.95 | 46.36 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 29.31 | 15.95 | 45.26 |
| POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 29.04 | 15.95 | 44.99 |
| POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE | 28.76 | 15.95 | 44.71 |
| POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES) (A): 180'-250': $.50 OVER SCALE (B): OVER 250' $.80 OVER SCALE | 28.60 | 15.95 | 44.55 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 | 28.44 | 15.95 | 44.39 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER $2.00 | 27.51 | 15.95 | 43.46 |
| IRONWORKER: REINFORCING AND STRUCTURAL | 43.40 | 30.27 | 73.67 |
| LABORER (PIPELINE ONLY): COMMON | 26.28 | 12.15 | 38.43 |
| AND OVER FROM THE MAIN POST OFFICE | 25.84 | 13.00 | 38.84 |
| LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | 28.48 | 13.00 | 41.48 |
| CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | 40.89 | 18.64 | 59.53 |
| PLUMBER (ZONE 1) | 37.71 | 23.44 | 61.15 |
| TRUCK DRIVER: WATER TRUCK | 24.48 | 11.67 | 36.15 |
| TRUCK DRIVER: LOWBOY TRUCK | 21.00 | 12.10 | 33.10 |
| OPERATOR: CONCRETE BATCH PLANT | 24.94 | 11.96 | 36.90 |
| OPERATOR: FORKLIFT | 21.20 | — | 21.20 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 20.97 | — | 20.97 |
| LABORER: PIPELAYER | 17.67 | 7.26 | 24.93 |
| LABORER: LANDSCAPE | 22.13 | 11.13 | 33.26 |
| LABORER: COMMON OR GENERAL | 23.75 | 8.98 | 32.73 |
| CARPENTER, EXCLUDES FORM WORK | 29.92 | 5.20 | 35.12 |
| TRUCK DRIVER: DUMP (OVER 6 YDS) | 37.02 | 20.93 | 57.95 |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) | 36.58 | 20.93 | 57.51 |