Heavy  Published 05/18/2026. 26 classifications. Covers 3 counties: Benewah, Clearwater, Latah

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
CARPENTER (FORM WORK ONLY)38.8717.8456.71
ELECTRICIAN49.5519.0968.64
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE30.4115.9546.36
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE29.3115.9545.26
POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE29.0415.9544.99
POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE28.7615.9544.71
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES) (A): 180'-250': $.50 OVER SCALE (B): OVER 250' $.80 OVER SCALE28.6015.9544.55
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.0028.4415.9544.39
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER $2.0027.5115.9543.46
IRONWORKER: REINFORCING AND STRUCTURAL43.4030.2773.67
LABORER (PIPELINE ONLY): COMMON26.2812.1538.43
AND OVER FROM THE MAIN POST OFFICE25.8413.0038.84
LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE28.4813.0041.48
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE40.8918.6459.53
PLUMBER (ZONE 1)37.7123.4461.15
TRUCK DRIVER: WATER TRUCK24.4811.6736.15
TRUCK DRIVER: LOWBOY TRUCK21.0012.1033.10
OPERATOR: CONCRETE BATCH PLANT24.9411.9636.90
OPERATOR: FORKLIFT21.20—21.20
OPERATOR: BOBCAT/SKID STEER/SKID LOADER20.97—20.97
LABORER: PIPELAYER17.677.2624.93
LABORER: LANDSCAPE22.1311.1333.26
LABORER: COMMON OR GENERAL23.758.9832.73
CARPENTER, EXCLUDES FORM WORK29.925.2035.12
TRUCK DRIVER: DUMP (OVER 6 YDS)37.0220.9357.95
TRUCK DRIVER: DUMP (6 YDS AND UNDER)36.5820.9357.51
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.