Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

Davis-Bacon rates — Benewah County, Idaho

Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.

Pick the construction type that matches your contract, not the highest rate. Building, Residential, Highway and Heavy are separate determinations with different rates, and using the wrong one is a common reason a certified payroll comes back rejected. Where your trade appears under several classifications the choice between them is a judgement call — the plainest match is usually right, and the contracting officer can confirm it.
Building
ID20260008 rev 1 · 05/18/2026 · 12 classifications
ClassificationBase rateFringeTotal
BOILERMAKER47.6728.3876.05
BRICKLAYER32.0518.2750.32
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK AND SCAFFOLD BUILDING)38.8717.8456.71
ELECTRICIAN49.5519.0968.64
ELEVATOR MECHANIC A. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS SERVICE AND 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS SERVICE AS VACATION PAY CREDIT. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY67.6138.44106.05
IRONWORKER: REINFORCING AND STRUCTURAL43.4030.2773.67
LABORER: COMMON OR GENERAL ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE32.1516.3048.45
LABORER (MASON TENDER (CEMENT/CONCRETE, BRICK (HOD))26.8412.3539.19
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE40.8918.6459.53
PLUMBER (ZONE 1)44.5726.5871.15
ROOFER35.7515.2150.96
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)39.0022.4261.42
Residential
ID20260003 rev 1 · 05/18/2026 · 12 classifications
ClassificationBase rateFringeTotal
TRUCK DRIVER10.33—10.33
SHEET METAL WORKER10.001.1011.10
ROOFER10.00—10.00
POWER EQUIPMENT OPERATORS: PAVER; BLADE, SCREED AND ROLLER (ASPHALT)8.00—8.00
POWER EQUIPMENT OPERATORS: FRONT END LOADER8.75—8.75
POWER EQUIPMENT OPERATORS: (BACKHOE)8.34—8.34
PLUMBER8.50—8.50
PAINTER8.00—8.00
LABORER7.25—7.25
ELECTRICIAN9.18—9.18
CARPENTER8.30—8.30
BRICKLAYER11.86—11.86
Highway
ID20260088 rev 1 · 05/18/2026 · 31 classifications
ClassificationBase rateFringeTotal
LABORER: MASON TENDER (CEMENT/CONCRETE)28.2113.0041.21
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE40.8918.6459.53
TRUCK DRIVER: WATER TRUCK23.1210.7533.87
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK22.5412.3534.89
TRUCK DRIVER: LOWBOY TRUCK22.1213.2035.32
TRUCK DRIVER: DUMP TRUCK23.4010.7534.15
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER22.6610.9033.56
TRAFFIC CONTROL: FLAGGER21.4610.1231.58
OPERATOR: SCREED25.7111.5537.26
OPERATOR: ROTOMILL29.784.5234.30
OPERATOR: ROLLER (SUBGRADE)22.248.5730.81
OPERATOR: ROLLER25.4911.5537.04
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)25.6611.0336.69
OPERATOR: OILER25.669.2334.89
OPERATOR: MECHANIC26.009.9335.93
OPERATOR: LOADER25.7610.3136.07
OPERATOR: HYDROSEEDER24.7611.5136.27
OPERATOR: GRADER/BLADE26.0010.3036.30
OPERATOR: CRUSHER25.069.2334.29
OPERATOR: CRANE27.1810.9738.15
OPERATOR: BULLDOZER25.7311.5137.24
OPERATOR: BROOM/SWEEPER26.8211.5538.37
OPERATOR: BOBCAT/SKID STEER/SKID LOADER25.3511.5536.90
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE25.9710.9536.92
LABORER: GRADE CHECKER23.4110.7834.19
LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND)23.9811.0535.03
LABORER: COMMON OR GENERAL22.9210.0132.93
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR22.869.4032.26
HIGHWAY/PARKING LOT STRIPING: PAINTER23.806.6730.47
ELECTRICIAN26.8311.9438.77
CARPENTER (FORM WORK ONLY)26.578.1034.67
Heavy
ID20260065 rev 1 · 05/18/2026 · 26 classifications
ClassificationBase rateFringeTotal
CARPENTER (FORM WORK ONLY)38.8717.8456.71
ELECTRICIAN49.5519.0968.64
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS & OVER), FRONT END LOADER (10 YDS & OVER) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE30.4115.9546.36
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000 GW), CRANES (45-85 TONS), HEAVY DUTY MECHANIC, FRONT END LOADER (8-10 YDS) ZONE PAY ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE29.3115.9545.26
POWER EQUIPMENT OPERATOR: GROUP 6 BACKHOE (45,000-110,000 GW), CRANE (25-45 TONS), BULLDOZER (D-6 AND OVER), GRADER/BLADE, FRONT-END LOADER(4-8 YDS), PAVER, SCRAPERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE29.0415.9544.99
POWER EQUIPMENT OPERATOR: GROUP 5: BACKHOE (45,000 GW & UNDER), CRANES (25 TONS & UNDER), DRILL (8 IN BIT AND OVER ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES): (A): 180'-250': $.50 OVER SCALE (B): OVER 250': $.80 OVER SCALE28.7615.9544.71
POWER EQUIPMENT OPERATOR: GROUP 4 FRONT END LOADER (UNDER 4 YDS) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2 45 MILES & OVER: $2.00 BOOM PAY (ALL CRANES) (A): 180'-250': $.50 OVER SCALE (B): OVER 250' $.80 OVER SCALE28.6015.9544.55
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER: $2.0028.4415.9544.39
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS (ALL) ZONE PAY: ZONE CENTERS: SPOKANE, PASCO, LEWISTON ZONE 1: 0-45 MILES: FREE ZONE 2: 45 MILES & OVER $2.0027.5115.9543.46
IRONWORKER: REINFORCING AND STRUCTURAL43.4030.2773.67
LABORER (PIPELINE ONLY): COMMON26.2812.1538.43
AND OVER FROM THE MAIN POST OFFICE25.8413.0038.84
LABORER: GROUP 4 ASPHALT INCLUDES RAKER, SHOVELER, SPREADER, AND DISTRIBUTOR ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE28.4813.0041.48
CEMENT MASON/CONCRETE FINISHER (ZONE 1) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATE): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE40.8918.6459.53
PLUMBER (ZONE 1)37.7123.4461.15
TRUCK DRIVER: WATER TRUCK24.4811.6736.15
TRUCK DRIVER: LOWBOY TRUCK21.0012.1033.10
OPERATOR: CONCRETE BATCH PLANT24.9411.9636.90
OPERATOR: FORKLIFT21.20—21.20
OPERATOR: BOBCAT/SKID STEER/SKID LOADER20.97—20.97
LABORER: PIPELAYER17.677.2624.93
LABORER: LANDSCAPE22.1311.1333.26
LABORER: COMMON OR GENERAL23.758.9832.73
CARPENTER, EXCLUDES FORM WORK29.925.2035.12
TRUCK DRIVER: DUMP (OVER 6 YDS)37.0220.9357.95
TRUCK DRIVER: DUMP (6 YDS AND UNDER)36.5820.9357.51
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.