| LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | 36.98 | 16.10 | 53.08 |
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 37.58 | 16.10 | 53.68 |
| APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | 37.35 | 16.10 | 53.45 |
| 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE | 36.81 | 16.10 | 52.91 |
| LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 36.64 | 16.10 | 52.74 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE | 36.33 | 16.10 | 52.43 |
| LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | 28.48 | 13.00 | 41.48 |
| TRUCK DRIVER: WATER TRUCK | 21.54 | 12.19 | 33.73 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | 23.93 | 11.27 | 35.20 |
| TRUCK DRIVER: LOWBOY TRUCK | 26.61 | 13.21 | 39.82 |
| TRUCK DRIVER: DUMP TRUCK | 21.59 | 10.93 | 32.52 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 17.69 | 4.66 | 22.35 |
| OPERATOR: SCREED | 22.30 | 7.22 | 29.52 |
| OPERATOR: ROLLER (SUBGRADE) | 19.99 | 7.99 | 27.98 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 24.37 | 7.11 | 31.48 |
| OPERATOR: OILER | 22.25 | 6.52 | 28.77 |
| OPERATOR: FORKLIFT | 23.13 | 9.17 | 32.30 |
| OPERATOR: CRANE | 23.34 | 9.45 | 32.79 |
| OPERATOR: BROOM/SWEEPER | 24.34 | 8.04 | 32.38 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.15 | 8.20 | 29.35 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 22.34 | 10.90 | 33.24 |
| LABORER: GRADE CHECKER | 20.64 | 7.37 | 28.01 |
| LABORER: COMMON OR GENERAL | 19.18 | 7.65 | 26.83 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 19.38 | 7.63 | 27.01 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 25.47 | 9.52 | 34.99 |
| ELECTRICIAN | 26.33 | 11.45 | 37.78 |
| CEMENT MASON/CONCRETE FINISHER | 22.90 | 11.99 | 34.89 |
| CARPENTER, EXCLUDES FORM WORK | 23.92 | 9.84 | 33.76 |
| CARPENTER (FORM WORK ONLY) | 26.24 | 9.48 | 35.72 |