Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

ID20260091 rev 1

Highway  Published 05/18/2026. 29 classifications. Covers 1 county: Bannock

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE36.9816.1053.08
POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE37.5816.1053.68
APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE37.3516.1053.45
8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE. BOOM PAY: ALL CRANES AND CONCRETE PUMP BOOM TRUCKS 100 FT TO 150 FT $.15 OVER SCALE 150 FT TO 200 FT $.30 OVER SCALE OVER 200 FT $.45 OVER SCALE36.8116.1052.91
LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S. POST OFFICES BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE36.6416.1052.74
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER ZONE PAY: ZONE 1 0 - 30 MILES: FREE ZONE 2 30 - 60 MILES: $30.00/PER DAY ZONE 3 MORE THAN 60 MILES $35.00/PER DAY IF A PROJECT IS LOCATED IN MORE THAN ONE ZONE THE LOWER ZONE RATE SHALL APPLY ZONES SHALL BE MEASURED FROM THE THE FOLLOWING U.S POST OFFICES: BOISE: 304 N. 8TH STREET TWIN FALLS: 253 2ND AVE. WEST POCATELLO: CLARK STREET IDAHO FALLS: 875 NORTH CAPITAL AVE36.3316.1052.43
LABORER: PIPELAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $2.00 BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE28.4813.0041.48
TRUCK DRIVER: WATER TRUCK21.5412.1933.73
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK23.9311.2735.20
TRUCK DRIVER: LOWBOY TRUCK26.6113.2139.82
TRUCK DRIVER: DUMP TRUCK21.5910.9332.52
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER17.694.6622.35
OPERATOR: SCREED22.307.2229.52
OPERATOR: ROLLER (SUBGRADE)19.997.9927.98
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)24.377.1131.48
OPERATOR: OILER22.256.5228.77
OPERATOR: FORKLIFT23.139.1732.30
OPERATOR: CRANE23.349.4532.79
OPERATOR: BROOM/SWEEPER24.348.0432.38
OPERATOR: BOBCAT/SKID STEER/SKID LOADER21.158.2029.35
LABORER: MASON TENDER - CEMENT/CONCRETE22.3410.9033.24
LABORER: GRADE CHECKER20.647.3728.01
LABORER: COMMON OR GENERAL19.187.6526.83
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR19.387.6327.01
HIGHWAY/PARKING LOT STRIPING: PAINTER25.479.5234.99
ELECTRICIAN26.3311.4537.78
CEMENT MASON/CONCRETE FINISHER22.9011.9934.89
CARPENTER, EXCLUDES FORM WORK23.929.8433.76
CARPENTER (FORM WORK ONLY)26.249.4835.72
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.