Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 31.10 | 16.40 | 47.50 |
| BOILERMAKER | 34.21 | 23.92 | 58.13 |
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SCAFFOLD BUILDER) | 32.35 | 11.95 | 44.30 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 32.57 | 14.05 | 46.62 |
| POWER EQUIPMENT OPERATOR: CRANE | 32.57 | 14.05 | 46.62 |
| POWER EQUIPMENT OPERATOR: (BACKHOE, EXCAVATOR, TRACKHOE) | 32.57 | 14.05 | 46.62 |
| IRONWORKER, STRUCTURAL | 33.75 | 14.03 | 47.78 |
| IRONWORKER, REINFORCING | 33.75 | 14.03 | 47.78 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 35.25 | 15.76 | 51.01 |
| TRUCK DRIVER: DUMP TRUCK | 13.60 | — | 13.60 |
| TILE SETTER | 20.00 | — | 20.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 20.00 | 3.77 | 23.77 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 28.00 4.17 ROOFER | 13.66 | — | 13.66 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 18.97 | 0.36 | 19.33 |
| PAINTER: SPRAY | 14.31 | — | 14.31 |
| PAINTER (BRUSH AND ROLLER) | 15.31 | 1.41 | 16.72 |
| OPERATOR: ROLLER | 14.00 | 1.78 | 15.78 |
| OPERATOR: LOADER | 14.69 | — | 14.69 |
| OPERATOR: GRADER/BLADE | 17.52 | 0.89 | 18.41 |
| OPERATOR: BULLDOZER | 19.96 | 0.40 | 20.36 |
| LABORER: PIPELAYER | 15.59 | — | 15.59 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 14.23 | — | 14.23 |
| LABORER: MASON TENDER - BRICK | 12.22 | — | 12.22 |
| LABORER: COMMON OR GENERAL | 14.74 | 3.25 | 17.99 |
| GLAZIER | 23.00 | 5.64 | 28.64 |
| ELECTRICIAN | 17.57 | 2.41 | 19.98 |
| CEMENT MASON/CONCRETE FINISHER | 19.19 | — | 19.19 |
| BRICKLAYER | 22.00 | — | 22.00 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | 9.86 | — | 9.86 |
| SHEETMETAL WORKER, INCLUDING HVAC DUCT INSTALLATION.$ 12.28 0.00 ROOFER, INCLUDES BUILT UP, METAL, SHAKE & SHINGLE, AND SINGLE PLY ROOFS | 10.00 | — | 10.00 |
| PLUMBER | 12.80 | — | 12.80 |
| PAINTER | 9.38 | — | 9.38 |
| OPERATOR: LOADER (FRONT END) | 12.52 | — | 12.52 |
| OPERATOR: BULLDOZER | 12.60 | — | 12.60 |
| OPERATOR: BACKHOE | 11.20 | — | 11.20 |
| LABORER: PIPELAYER | 9.00 | — | 9.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 7.88 | — | 7.88 |
| LABORER: LANDSCAPE | 7.66 | — | 7.66 |
| LABORER: COMMON OR GENERAL | 8.00 | — | 8.00 |
| IRONWORKER, STRUCTURAL | 11.91 | 3.40 | 15.31 |
| IRONWORKER, ORNAMENTAL | 10.46 | — | 10.46 |
| ELECTRICIAN, INCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS | 11.67 | — | 11.67 |
| CEMENT MASON/CONCRETE FINISHER | 11.75 | — | 11.75 |
| CARPENTER, INCLUDES FORM WORK | 12.94 | 0.27 | 13.21 |
| BRICKLAYER | 13.29 | — | 13.29 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (DRILL) | 24.15 | 9.36 | 33.51 |
| TRUCK DRIVER: WATER TRUCK | 13.47 | — | 13.47 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 15.56 | — | 15.56 |
| TRUCK DRIVER: PICKUP TRUCK | 15.97 | — | 15.97 |
| TRUCK DRIVER: LOWBOY TRUCK | 17.86 | — | 17.86 |
| TRUCK DRIVER: FLATBED TRUCK | 15.00 | — | 15.00 |
| TRUCK DRIVER: DUMP TRUCK | 15.23 | — | 15.23 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 12.13 | — | 12.13 |
| TRAFFIC CONTROL: FLAGGER | 11.84 | — | 11.84 |
| PAINTER (BRUSH AND ROLLER) | 15.97 | 1.27 | 17.24 |
| OPERATOR: AGGREGATE SPREADER | 15.81 | — | 15.81 |
| OPERATOR: TRACTOR | 12.50 | — | 12.50 |
| OPERATOR: SCRAPER | 13.30 | — | 13.30 |
| OPERATOR: ROLLER | 15.43 | — | 15.43 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 17.41 | — | 17.41 |
| OPERATOR: OILER | 16.83 | — | 16.83 |
| OPERATOR: MILLING MACHINE | 16.42 | — | 16.42 |
| OPERATOR: MECHANIC | 21.67 | — | 21.67 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | 16.89 | — | 16.89 |
| OPERATOR: LOADER | 16.57 | — | 16.57 |
| OPERATOR: GRADER/BLADE | 17.81 | — | 17.81 |
| OPERATOR: DRAGLINE | 25.95 | 11.25 | 37.20 |
| OPERATOR: DISTRIBUTOR | 17.44 | — | 17.44 |
| OPERATOR: CRANE | 23.25 | — | 23.25 |
| OPERATOR: CONCRETE SAW | 17.97 | — | 17.97 |
| OPERATOR: BULLDOZER | 18.80 | — | 18.80 |
| OPERATOR: BROOM/SWEEPER | 13.07 | — | 13.07 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.88 | — | 13.88 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 18.53 | — | 18.53 |
| OPERATOR: ASPHALT SPREADER | 16.79 | — | 16.79 |
| LABORER: EROSION CONTROL | 10.91 | — | 10.91 |
| LABORER: PIPELAYER | 16.50 | — | 16.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 14.05 | — | 14.05 |
| LABORER: CONCRETE WORKER | 14.57 | — | 14.57 |
| LABORER: COMMON OR GENERAL | 12.54 | — | 12.54 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 13.48 | — | 13.48 |
| LABORER GRADE CHECKER | 14.51 | — | 14.51 |
| IRONWORKER, STRUCTURAL | 22.40 | — | 22.40 |
| IRONWORKER, REINFORCING | 17.97 | — | 17.97 |
| INSTALLER - GUARDRAIL | 17.24 | — | 17.24 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | 14.62 | — | 14.62 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 20.32 | — | 20.32 |
| HIGHWAY/PARKING LOT STRIPING: LABORER | 11.95 | — | 11.95 |
| FORM WORKER | 16.69 | — | 16.69 |
| ELECTRICIAN | 19.73 | — | 19.73 |
| CEMENT MASON/CONCRETE FINISHER | 17.18 | — | 17.18 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | 12.25 | 2.58 | 14.83 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | 17.64 | 2.14 | 19.78 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES | 18.13 | 3.66 | 21.79 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | 13.91 | 2.04 | 15.95 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | 13.04 | 1.41 | 14.45 |
| ELECTRICIAN | 20.86 | 4.04 | 24.90 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | 13.71 | — | 13.71 |
| CARPENTER, INCLUDES FORM WORK | 20.26 | 8.59 | 28.85 |