Building Published 05/18/2026. 28 classifications. Covers 4 counties: Bibb, Blount, Chilton, Walker
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 31.10 | 16.40 | 47.50 |
| BOILERMAKER | 34.21 | 23.92 | 58.13 |
| CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND SCAFFOLD BUILDER) | 32.35 | 11.95 | 44.30 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | 32.57 | 14.05 | 46.62 |
| POWER EQUIPMENT OPERATOR: CRANE | 32.57 | 14.05 | 46.62 |
| POWER EQUIPMENT OPERATOR: (BACKHOE, EXCAVATOR, TRACKHOE) | 32.57 | 14.05 | 46.62 |
| IRONWORKER, STRUCTURAL | 33.75 | 14.03 | 47.78 |
| IRONWORKER, REINFORCING | 33.75 | 14.03 | 47.78 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 35.25 | 15.76 | 51.01 |
| TRUCK DRIVER: DUMP TRUCK | 13.60 | — | 13.60 |
| TILE SETTER | 20.00 | — | 20.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 20.00 | 3.77 | 23.77 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 28.00 4.17 ROOFER | 13.66 | — | 13.66 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 18.97 | 0.36 | 19.33 |
| PAINTER: SPRAY | 14.31 | — | 14.31 |
| PAINTER (BRUSH AND ROLLER) | 15.31 | 1.41 | 16.72 |
| OPERATOR: ROLLER | 14.00 | 1.78 | 15.78 |
| OPERATOR: LOADER | 14.69 | — | 14.69 |
| OPERATOR: GRADER/BLADE | 17.52 | 0.89 | 18.41 |
| OPERATOR: BULLDOZER | 19.96 | 0.40 | 20.36 |
| LABORER: PIPELAYER | 15.59 | — | 15.59 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 14.23 | — | 14.23 |
| LABORER: MASON TENDER - BRICK | 12.22 | — | 12.22 |
| LABORER: COMMON OR GENERAL | 14.74 | 3.25 | 17.99 |
| GLAZIER | 23.00 | 5.64 | 28.64 |
| ELECTRICIAN | 17.57 | 2.41 | 19.98 |
| CEMENT MASON/CONCRETE FINISHER | 19.19 | — | 19.19 |
| BRICKLAYER | 22.00 | — | 22.00 |