Every active general wage determination covering this county, one section per construction type. These rates are the minimum that must be paid on a federal or federally assisted contract.
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 31.10 | 16.40 | 47.50 |
| BOILERMAKER | 34.21 | 23.92 | 58.13 |
| ELECTRICIAN | 30.90 | 10.34 | 41.24 |
| POWER EQUIPMENT OPERATOR: CRANE | 31.75 | 14.55 | 46.30 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | 29.90 | 14.55 | 44.45 |
| PLUMBER | 35.20 | 13.51 | 48.71 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 27.22 | 13.98 | 41.20 |
| TRUCK DRIVER: DUMP TRUCK | 13.18 | — | 13.18 |
| TILE SETTER | 15.86 | — | 15.86 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 21.50 | — | 21.50 |
| ROOFER | 13.61 | — | 13.61 |
| PIPEFITTER | 20.78 | 5.04 | 25.82 |
| PAINTER: SPRAY | 14.31 | — | 14.31 |
| PAINTER (BRUSH AND ROLLER) | 15.41 | — | 15.41 |
| OPERATOR: ROLLER | 14.00 | 1.78 | 15.78 |
| OPERATOR: LOADER | 14.69 | — | 14.69 |
| OPERATOR: GRADER/BLADE | 17.52 | 0.89 | 18.41 |
| OPERATOR: FORKLIFT | 20.69 | — | 20.69 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 20.23 | 11.78 | 32.01 |
| LABORER: PIPELAYER | 12.58 | — | 12.58 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 12.16 | — | 12.16 |
| LABORER: MASON TENDER - BRICK | 11.00 | — | 11.00 |
| LABORER: COMMON OR GENERAL | 12.31 | — | 12.31 |
| IRONWORKER, STRUCTURAL | 19.73 | 1.15 | 20.88 |
| IRONWORKER, REINFORCING | 22.86 | 7.94 | 30.80 |
| CEMENT MASON/CONCRETE FINISHER | 16.00 | — | 16.00 |
| CARPENTER, INCLUDES FORM WORK | 17.37 | — | 17.37 |
| BRICKLAYER | 19.81 | — | 19.81 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER | 10.02 | — | 10.02 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 10.90 0.00 ROOFER, INCLUDING SHAKE & SHINGLE, AND SINGLE PLY ROOFS | 12.00 | — | 12.00 |
| PLUMBER | 12.92 | — | 12.92 |
| PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING | 10.21 | — | 10.21 |
| OPERATOR: BULLDOZER | 11.71 | — | 11.71 |
| OPERATOR: BACKHOE | 9.80 | — | 9.80 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 8.00 | — | 8.00 |
| LABORER: LANDSCAPE | 7.25 | — | 7.25 |
| LABORER: COMMON OR GENERAL | 7.50 | — | 7.50 |
| ELECTRICIAN, INCLUDES HVAC/ TEMPERATURE CONTROL INSTALLATION | 11.86 | — | 11.86 |
| DRYWALL FINISHER/TAPER | 10.00 | — | 10.00 |
| CEMENT MASON/CONCRETE FINISHER | 10.68 | — | 10.68 |
| CARPENTER | 10.00 | — | 10.00 |
| BRICKLAYER | 11.89 | — | 11.89 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ELECTRICIAN | 30.90 | 10.34 | 41.24 |
| TRUCK DRIVER: WATER TRUCK | 13.50 | — | 13.50 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 15.56 | — | 15.56 |
| TRUCK DRIVER: PICKUP TRUCK | 15.13 | — | 15.13 |
| TRUCK DRIVER: LOWBOY TRUCK | 16.79 | — | 16.79 |
| TRUCK DRIVER: FLATBED TRUCK | 15.00 | — | 15.00 |
| TRUCK DRIVER: DUMP TRUCK | 16.51 | — | 16.51 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 13.13 | — | 13.13 |
| TRAFFIC CONTROL: FLAGGER | 14.09 | — | 14.09 |
| PAINTER (BRUSH AND ROLLER) | 15.97 | 1.27 | 17.24 |
| OPERATOR: SCRAPER | 13.30 | — | 13.30 |
| OPERATOR: ROLLER | 15.42 | — | 15.42 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 15.54 | — | 15.54 |
| OPERATOR: OILER | 16.83 | — | 16.83 |
| OPERATOR: MILLING MACHINE | 15.79 | — | 15.79 |
| OPERATOR: MECHANIC | 19.16 | — | 19.16 |
| OPERATOR: MATERIAL TRANSFER VEHICLE | 16.60 | — | 16.60 |
| OPERATOR: LOADER | 17.45 | — | 17.45 |
| OPERATOR: GRADER/BLADE | 17.98 | — | 17.98 |
| OPERATOR: DRILL | 26.73 | 11.25 | 37.98 |
| OPERATOR: CRANE | 24.91 | — | 24.91 |
| OPERATOR: BULLDOZER | 18.10 | — | 18.10 |
| OPERATOR: BROOM/SWEEPER | 13.38 | — | 13.38 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.88 | — | 13.88 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 18.78 | — | 18.78 |
| OPERATOR: ASPHALT SPREADER | 15.95 | — | 15.95 |
| LABORER: EROSION CONTROL | 11.61 | — | 11.61 |
| LABORER: PIPELAYER | 15.86 | — | 15.86 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.47 | — | 13.47 |
| LABORER: COMMON OR GENERAL | 13.09 | — | 13.09 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 14.22 | — | 14.22 |
| LABORER GRADE CHECKER | 14.08 | — | 14.08 |
| IRONWORKER, STRUCTURAL | 22.40 | — | 22.40 |
| IRONWORKER, REINFORCING | 17.54 | — | 17.54 |
| HIGHWAY/PARKING LOT STRIPING: TRUCK DRIVER (LINE STRIPING TRUCK) | 14.55 | — | 14.55 |
| HIGHWAY/PARKING LOT STRIPING: OPERATOR (STRIPING MACHINE) | 19.82 | — | 19.82 |
| FORM WORKER | 12.40 | — | 12.40 |
| CEMENT MASON/CONCRETE FINISHER | 16.04 | — | 16.04 |
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR: BULLDOZER (PIPELINE) | 48.89 | 18.00 | 66.89 |
| POWER EQUIPMENT OPERATOR: BACKHOE, EXCAVATOR, TRACKHOE (PIPELINE) | 48.89 | 18.00 | 66.89 |
| TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES | 12.56 | 2.12 | 14.68 |
| OPERATOR: LOADER, INCLUDES WATER SEWER LINES | 17.64 | 2.14 | 19.78 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES (EXCLUDES, PIPELINE) | 13.56 | — | 13.56 |
| LABORER: PIPELAYER, INCLUDES WATER SEWER LINES | 11.95 | — | 11.95 |
| LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES | 10.00 | — | 10.00 |
| ELECTRICIAN | 19.56 | — | 19.56 |
| CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES | 13.78 | — | 13.78 |
| CARPENTER, INCLUDES FORM WORK | 19.05 | 7.86 | 26.91 |