Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

AL20260104 rev 1

Heavy  Published 05/18/2026. 10 classifications. Covers 1 county: Baldwin

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
POWER EQUIPMENT OPERATOR: BULLDOZER (PIPELINE)48.8918.0066.89
POWER EQUIPMENT OPERATOR: BACKHOE, EXCAVATOR, TRACKHOE (PIPELINE)48.8918.0066.89
TRUCK DRIVER: DUMP TRUCK, INCLUDES WATER SEWER LINES12.562.1214.68
OPERATOR: LOADER, INCLUDES WATER SEWER LINES17.642.1419.78
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, INCLUDES WATER SEWER LINES (EXCLUDES, PIPELINE)13.56—13.56
LABORER: PIPELAYER, INCLUDES WATER SEWER LINES11.95—11.95
LABORER: COMMON OR GENERAL, INCLUDES WATER SEWER LINES10.00—10.00
ELECTRICIAN19.56—19.56
CEMENT MASON/CONCRETE FINISHER, INCLUDES WATER SEWER LINES13.78—13.78
CARPENTER, INCLUDES FORM WORK19.057.8626.91
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.