Highway Published 05/18/2026. 27 classifications. Covers 1 county: Summers
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| OPERATOR: LOADER (SIX (6) CUBIC YARDS CAPACITY AND OVER) | 40.35 | 20.30 | 60.65 |
| OPERATOR: CRANE | 40.35 | 20.30 | 60.65 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 37.59 | 20.30 | 57.89 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 37.59 | 20.30 | 57.89 |
| OPERATOR: BROOM/SWEEPER | 37.59 | 20.30 | 57.89 |
| OPERATOR: BULLDOZER | 37.59 | 20.30 | 57.89 |
| OPERATOR: DRILL | 37.59 | 20.30 | 57.89 |
| OPERATOR: FORKLIFT | 37.59 | 20.30 | 57.89 |
| OPERATOR: GRADER/BLADE | 37.59 | 20.30 | 57.89 |
| OPERATOR: MILLING MACHINE | 37.59 | 20.30 | 57.89 |
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | 37.59 | 20.30 | 57.89 |
| OPERATOR: ROLLER | 36.48 | 20.30 | 56.78 |
| IRONWORKER | 36.10 | 24.25 | 60.35 |
| LABORER: COMMON OR GENERAL | 29.00 | 17.40 | 46.40 |
| TRAFFIC CONTROL: MAINTENANCE PERSON | 27.91 | 17.40 | 45.31 |
| LABORER: GRADE CHECKER | 29.00 | 17.40 | 46.40 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 29.00 | 17.40 | 46.40 |
| LABORER: LASER SCREED OPERATOR | 30.03 | 17.40 | 47.43 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 29.00 | 17.40 | 46.40 |
| LABORER: GUARDRAIL INSTALLATION | 29.00 | 17.40 | 46.40 |
| CEMENT MASON/CONCRETE FINISHER | 35.77 | 27.54 | 63.31 |
| TRUCK DRIVER: DUMP TRUCK | 27.76 | 16.15 | 43.91 |
| TRAFFIC CONTROL: FLAGGER | 24.86 | 16.30 | 41.16 |
| OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT(ASPHALT, AGGREGATE, & CONCRETE) | 32.12 | 18.93 | 51.05 |
| OPERATOR: CONCRETE SCREED | 27.61 | 18.64 | 46.25 |
| OPERATOR: MECHANIC | 34.20 | 19.75 | 53.95 |
| CARPENTER | 27.72 | 19.81 | 47.53 |