Building Published 05/18/2026. 26 classifications. Covers 1 county: Tyler
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | 46.50 | 29.43 | 75.93 |
| BOILERMAKER | 47.13 | 28.93 | 76.06 |
| BRICKLAYER (BRICKLAYER & BRICK POINTER/CAULKER/CLEANER) | 31.70 | 25.93 | 57.63 |
| MASON - STONE | 33.00 | 26.18 | 59.18 |
| MILLWRIGHT | 37.40 | 26.06 | 63.46 |
| ELECTRICIAN | 39.01 | 30.75 | 69.76 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, OILER | 34.71 | 22.05 | 56.76 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, EXCAVATOR, BULLDOZER, ALL OTHER CRANES | 45.21 | 22.05 | 67.26 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | 46.21 | 22.05 | 68.26 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | 46.56 | 22.05 | 68.61 |
| IRONWORKER (ORNAMENTAL, REINFORCING, AND STRUCTURAL) | 35.19 | 25.66 | 60.85 |
| LABORER (MASON TENDER - CEMENT/CONCRETE) | 24.13 | 16.20 | 40.33 |
| LABORER: GROUP 2 CONCRETE WORKER, DEWATERING, GRADE CHECKER, MASON TENDER-BRICK, MORTAR MIXER, RIGGING AND SIGNALING, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR | 24.13 | 16.05 | 40.18 |
| LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, WATER BOY | 24.13 | 15.05 | 39.18 |
| LABORER: ASPHALT RAKER | 25.92 | 16.88 | 42.80 |
| PAINTER (BRUSH, ROLLER AND SPRAY) | 29.47 | 18.72 | 48.19 |
| GLAZIER | 32.89 | 13.38 | 46.27 |
| PLUMBER | 34.05 | 41.05 | 75.10 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 43.26 | 28.90 | 72.16 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | 34.92 | 29.70 | 64.62 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | 28.52 | 3.00 | 31.52 |
| ROOFER | 24.28 | 9.32 | 33.60 |
| OPERATOR: FORKLIFT | 33.09 | 3.00 | 36.09 |
| LABORER (PIPELAYER) | 24.45 | 16.41 | 40.86 |
| PAINTER (DRYWALL FINISHING/TAPING) | 26.36 | 17.68 | 44.04 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | 36.10 | 29.06 | 65.16 |