Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

WI20260009 rev 1

Building  Published 05/18/2026. 35 classifications. Covers 1 county: Racine

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT)45.8838.1584.03
BOILERMAKER (BOILERMAKER)46.5234.6381.15
TILE SETTER39.1928.9068.09
BRICKLAYER44.7128.9073.61
CARPENTER & SOFT FLOOR LAYER (INCLUDING ACOUSTICAL WORK AND DRYWALL HANGING; EXCLUDING BATT INSULATION)45.4631.5276.98
MILLWRIGHT44.0332.9476.97
PILEDRIVERMAN44.3934.7979.18
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK)31.1720.0851.25
ELECTRICIAN (EXCEPT BURLINGTON TOWNSHIP)48.5026.2574.75
ELECTRICIAN (BURLINGTON TOWNSHIP)43.6523.5967.24
ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: 8% OF REGULAR BASIC FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY61.9638.44100.40
HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR43.5928.5572.14
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR48.7428.5577.29
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR52.7228.5581.27
HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR54.2128.5582.76
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR54.7128.5583.26
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR55.2128.5583.76
IRONWORKER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY47.5233.6781.19
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER (PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS)31.6724.6856.35
LABORER (PLASTER LABORER, MASON TENDER)38.9224.4263.34
LABORER (GENERAL LABORER)38.7124.4263.13
PAINTERS: (SPRAY, SANDBLAST)44.6423.3567.99
PAINTERS: (BRUSH, ROLLER, DRYWALL FINISHER)43.6423.3566.99
GLAZIER49.7925.1574.94
PLASTERER37.2030.9268.12
CEMENT MASON/CONCRETE FINISHER38.0431.3869.42
PLUMBER/PIPEFITTER (INCLUDING HVAC WORK)57.3529.3786.72
SPRINKLER FITTER51.6829.7381.41
SHEET METAL WORKER48.9238.2187.13
TILE & MARBLE FINISHER13.898.6022.49
ROOFER18.013.2821.29
LABORERS: LANDSCAPE8.734.9013.63
LABORERS: CONCRETE WORKER16.343.5919.93
ASBESTOS WORKER/HEAT AND FROST INSULATOR25.368.3733.73
TRUCK DRIVER (3 OR MORE AXLES)39.7228.7068.42
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.