Building Published 05/18/2026. 32 classifications. Covers 2 counties: Chippewa, Eau Claire
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | 55.34 | 34.03 | 89.37 |
| BOILERMAKER (BOILERMAKER) | 46.52 | 34.63 | 81.15 |
| BRICKLAYER & TILE SETTER | 39.50 | 28.69 | 68.19 |
| MILLWRIGHT | 42.00 | 28.85 | 70.85 |
| SOFT FLOOR LAYER | 41.43 | 29.99 | 71.42 |
| ELECTRICIAN | 44.29 | 25.21 | 69.50 |
| ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | 31.17 | 20.08 | 51.25 |
| ELEVATOR MECHANIC FOOTNOTE: A.PAID VACATION EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | 62.52 | 38.44 | 100.96 |
| HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 41.60 | 27.89 | 69.49 |
| HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 43.13 | 27.89 | 71.02 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 45.20 | 27.89 | 73.09 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 45.73 | 27.89 | 73.62 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 49.28 | 27.89 | 77.17 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 50.53 | 27.89 | 78.42 |
| IRONWORKER | 46.35 | 36.86 | 83.21 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | 36.65 | 19.97 | 56.62 |
| LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | 37.70 | 19.97 | 57.67 |
| PAINTER | 24.11 | 12.15 | 36.26 |
| DRYWALL FINISHER/TAPER | 24.61 | 12.15 | 36.76 |
| GLAZIER | 42.72 | 11.93 | 54.65 |
| PLASTERER | 39.75 | 25.10 | 64.85 |
| CEMENT MASON/CONCRETE FINISHER | 37.25 | 27.84 | 65.09 |
| PLUMBER/PIPEFITTER (INCLUDING HVAC WORK) | 50.94 | 25.98 | 76.92 |
| SPRINKLER FITTER | 51.68 | 29.73 | 81.41 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK AND TECHNICIANS) | 42.00 | 31.56 | 73.56 |
| TILE & MARBLE FINISHER | 13.89 | 8.25 | 22.14 |
| ROOFER | 18.01 | 3.28 | 21.29 |
| LABORERS: LANDSCAPE | 8.73 | 4.90 | 13.63 |
| LABORERS: CONCRETE WORKER | 16.34 | 3.59 | 19.93 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | 25.36 | 8.37 | 33.73 |
| TRUCK DRIVER (3 OR MORE AXLES) | 39.72 | 28.70 | 68.42 |
| TRUCK DRIVER (1 & 2 AXLES) | 39.57 | 28.70 | 68.27 |