Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

WI20260002 rev 1

Building  Published 05/18/2026. 28 classifications. Covers 1 county: Marathon

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT)45.2430.5675.80
BOILERMAKER (BOILERMAKER)46.5234.6381.15
BRICKLAYER (BRICKLAYER, CEMENT MASON, TILE LAYER)39.3628.8368.19
SOFT FLOOR LAYER41.4329.9971.42
MILLWRIGHT42.0028.8570.85
ELECTRICIAN40.1922.9063.09
ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE AS VACATION PAY FOR EMPLOYEES WITH MORE THAN 5 YEARS OR MORE OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY65.1738.44103.61
HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR41.6027.8969.49
HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR43.1327.8971.02
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR45.2027.8973.09
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR45.7327.8973.62
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR49.2827.8977.17
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR50.5327.8978.42
IRONWORKER44.0032.6676.66
LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER37.0519.9757.02
ASBESTOS ABATEMENT/HAZARDOUS WASTE (PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS). NOTE: MASON TENDER $1.00 OVER GENERAL LABORER36.6519.9756.62
PAINTERS: (BRUSH, ROLLER, SPRAY, AND DRYWALL FINISHING)37.6521.1758.82
GLAZIER42.4120.0662.47
PLUMBER/PIPEFITTER (INCLUDING HVAC WORK)50.9425.9876.92
SPRINKLER FITTER51.6829.7381.41
SHEET METAL WORKER (INCLUDING HVAC WORK)42.9032.4775.37
TILE & MARBLE FINISHER13.898.2022.09
ROOFER18.013.2821.29
LABORERS: LANDSCAPE8.734.9013.63
LABORERS: CONCRETE WORKER16.343.5919.93
ASBESTOS WORKER/HEAT AND FROST INSULATOR25.368.3733.73
TRUCK DRIVER (3 OR MORE AXLES)39.7228.7068.42
TRUCK DRIVER (1 & 2 AXLES)39.5728.7068.27
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.