Building Published 05/18/2026. 45 classifications. Covers 4 counties: Milwaukee, Ozaukee, Washington, Waukesha
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT) | 45.88 | 38.15 | 84.03 |
| BOILERMAKER (BOILERMAKER) | 46.52 | 34.63 | 81.15 |
| TILE LAYER | 41.27 | 26.78 | 68.05 |
| TERRAZZO WORKER | 42.24 | 26.78 | 69.02 |
| BRICKLAYER | 45.72 | 27.42 | 73.14 |
| MARBLE MASON | 45.72 | 27.42 | 73.14 |
| CARPENTER & SOFT FLOOR LAYER (INCLUDING ACOUSTICAL WORK AND DRYWALL HANGING; EXCLUDING BATT INSULATION) | 45.46 | 31.52 | 76.98 |
| MILLWRIGHT | 44.03 | 32.94 | 76.97 |
| PILEDRIVERMAN | 44.39 | 34.79 | 79.18 |
| ELECTRICIAN | 50.86 | 28.26 | 79.12 |
| SOUND & COMMUNICATIONS (TECHNICIAN) | 37.13 | 21.58 | 58.71 |
| SOUND & COMMUNICATIONS (INSTALLER) | 37.13 | 21.58 | 58.71 |
| ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: 8% OF REGULAR BASIC FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | 61.96 | 38.44 | 100.40 |
| HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 43.59 | 28.55 | 72.14 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 48.74 | 28.55 | 77.29 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 52.72 | 28.55 | 81.27 |
| HAZARDOUS WASTE PREMIUMS EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 54.21 | 28.55 | 82.76 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 54.71 | 28.55 | 83.26 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | 55.21 | 28.55 | 83.76 |
| IRONWORKER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY | 47.52 | 33.67 | 81.19 |
| LABORER: (8) BARCO TAMPER | 41.97 | 23.92 | 65.89 |
| LABORER: (7) CAISSON WORK | 41.28 | 23.92 | 65.20 |
| LABORER: (6) NOZZLEMAN | 41.13 | 23.92 | 65.05 |
| LABORER: (5) CONSTRUCTION SPECIALIST | 41.09 | 23.92 | 65.01 |
| LABORER: (4) CAISSON WORKER - TOPMAN | 40.86 | 23.92 | 64.78 |
| LABORER: (3) JACKHAMMER OPERATOR, GUNNITE MACHINE MAN | 40.77 | 23.92 | 64.69 |
| LABORER: (2) AIR & ELECTRIC EQUIPMENT, MORTAR MIXER, SCAFFOLD BUILDER, ERECTOR, AND SWING STAGE | 40.62 | 23.92 | 64.54 |
| LABORER: (1) GENERAL LABORER (INCLUDING PLASTER TENDER) | 40.48 | 23.92 | 64.40 |
| ASBESTOS LABORER (ASBESTOS ABATEMENT [PREPARATION, REMOVAL, AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS]) | 40.48 | 23.92 | 64.40 |
| PAINTERS: (3) DRYWALL TAPER/FINISHER | 42.79 | 24.87 | 67.66 |
| PAINTERS: (2) SPRAY & SANDBLAST | 43.19 | 24.87 | 68.06 |
| PAINTERS: (1) BRUSH, ROLLER | 42.44 | 24.87 | 67.31 |
| GLAZIER | 49.79 | 25.15 | 74.94 |
| CEMENT MASON/CONCRETE FINISHER | 43.27 | 25.69 | 68.96 |
| PLASTERER | 39.89 | 28.04 | 67.93 |
| PLUMBER (INCLUDING HVAC WORK) | 60.05 | 27.90 | 87.95 |
| PIPEFITTER (INCLUDING HVAC WORK) | 58.92 | 31.34 | 90.26 |
| SPRINKLER FITTER | 52.40 | 34.31 | 86.71 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK AND TECHNICIANS) | 58.03 | 29.98 | 88.01 |
| TILE & MARBLE FINISHER | 13.89 | 7.43 | 21.32 |
| ROOFER | 18.01 | 3.28 | 21.29 |
| LABORERS: LANDSCAPE | 8.73 | 8.40 | 17.13 |
| LABORERS: CONCRETE WORKER | 16.34 | 3.59 | 19.93 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | 25.36 | 8.37 | 33.73 |
| TRUCK DRIVER (3 OR MORE AXLES) | 39.72 | 28.70 | 68.42 |