Heavy Published 05/18/2026. 60 classifications. Covers 1 county: King
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 55.34 | 20.05 | 75.39 |
| PILEDRIVER PERSON | 65.53 | 19.13 | 84.66 |
| CARPENTER | 63.98 | 19.13 | 83.11 |
| ELECTRICIAN | 75.96 | 33.48 | 109.44 |
| LINE CONSTRUCTION: LINE PERSON | 64.17 | 24.54 | 88.71 |
| TREE TRIMMER: GROUND PERSON | 22.60 | 16.37 | 38.97 |
| TREE TRIMMER | 42.57 | 17.97 | 60.54 |
| LINE CONSTRUCTION: (CABLE SPLICER) | 64.17 | 24.77 | 88.94 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | 55.19 | 20.94 | 76.13 |
| LINE CONSTRUCTION: (GROUND PERSON) | 37.53 | 17.74 | 55.27 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | 61.14 | 27.57 | 88.71 |
| OPERATOR: LOADER (OVERHEAD 8 YARDS & OVER) | 61.93 | 27.57 | 89.50 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | 62.85 | 27.57 | 90.42 |
| OPERATOR: SCREED | 61.93 | 27.57 | 89.50 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | 60.46 | 27.57 | 88.03 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | 56.63 | 27.57 | 84.20 |
| OPERATOR: CRANE GROUP III THROUGH 19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS | 60.46 | 27.57 | 88.03 |
| OPERATOR: CRANE GROUP II 20 TONS THROUGH 44 TONS WITH ATTACHMENTS | 61.14 | 27.57 | 88.71 |
| OPERATOR: CRANE GROUP IAAA 300 TONS AND OVER OR 300' OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | 64.66 | 27.57 | 92.23 |
| OPERATOR: CRANE GROUP IAA: 200 TONS THROUGH 299 TONS, OR 250 OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | 63.75 | 27.57 | 91.32 |
| OPERATOR: CRANE GROUP IA: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | 62.85 | 27.57 | 90.42 |
| OPERATOR: CRANE GROUP I: 45 TONS THROUGH 99 TONS, UNDER 150? OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | 61.93 | 27.57 | 89.50 |
| OPERATOR: SCRAPER (SELF PROPELLED UNDER 45) | 61.14 | 27.57 | 88.71 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | 60.46 | 27.57 | 88.03 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT) | 61.14 | 27.57 | 88.71 |
| OPERATOR: GRADER/BLADE | 61.93 | 27.57 | 89.50 |
| OPERATOR: CONCRETE PUMP | 61.14 | 27.57 | 88.71 |
| OPERATOR: BULLDOZER (D9 & UNDER) | 60.46 | 27.57 | 88.03 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | 61.93 | 27.57 | 89.50 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | 61.14 | 27.57 | 88.71 |
| OPERATOR: MECHANIC | 62.85 | 27.57 | 90.42 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL OPERATOR) | 60.46 | 27.57 | 88.03 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL LOCATOR) | 61.14 | 27.57 | 88.71 |
| OPERATOR: DRILL (DRILLING MACHINE) | 62.85 | 27.57 | 90.42 |
| IRONWORKER | 57.94 | 34.52 | 92.46 |
| LABORER: COMMON OR GENERAL | 50.38 | 16.96 | 67.34 |
| TRAFFIC CONTROL: FLAGGER | 40.88 | 16.72 | 57.60 |
| LABORER: FENCE ERECTOR | 40.88 | 16.72 | 57.60 |
| LABORER: PIPELAYER | 51.52 | 16.99 | 68.51 |
| LABORER: CONCRETE SAW CHAIN | 51.52 | 16.99 | 68.51 |
| LABORER: HOD CARRIER | 52.31 | 17.01 | 69.32 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 50.38 | 16.96 | 67.34 |
| LABORER: NOZZLE PERSON | 52.31 | 17.01 | 69.32 |
| PAINTER | 41.24 | 14.70 | 55.94 |
| CEMENT MASON/CONCRETE FINISHER | 54.16 | 21.27 | 75.43 |
| PLUMBER | 60.72 | 34.15 | 94.87 |
| PIPEFITTER | 75.21 | 33.88 | 109.09 |
| SHEET METAL WORKER | 69.86 | 33.39 | 103.25 |
| TRUCK DRIVER: WATER TRUCK | 31.62 | 16.84 | 48.46 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 32.35 | 13.44 | 45.79 |
| OPERATOR: MILLING MACHINE | 48.95 | 10.33 | 59.28 |
| OPERATOR: FORKLIFT | 49.89 | — | 49.89 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 50.49 | — | 50.49 |
| MILLWRIGHT | 51.09 | 8.85 | 59.94 |
| LABORER: LANDSCAPE | 27.40 | — | 27.40 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 41.71 | 6.33 | 48.04 |
| TRUCK DRIVER: DUMP TRUCK | 55.48 | 27.52 | 83.00 |
| TRUCK DRIVER: ASPHALT MIX | 55.43 | 27.52 | 82.95 |
| GRADE CHECKER | 49.16 | 18.87 | 68.03 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 39.00 | 14.40 | 53.40 |