Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

WA20260051 rev 1

Heavy  Published 05/18/2026. 26 classifications. Covers 1 county: Lewis

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
MILLWRIGHT55.3922.3877.77
CARPENTER, INCLUDES FORM WORK63.9819.1383.11
ELECTRICIAN65.1426.5691.70
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A FRAME-10 TONS AND UNDER; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS; BOOM TRUCK 10 TONS AND UNDER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR55.1327.3282.45
3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR58.8927.3286.21
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR59.5627.3286.88
3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR62.9927.3290.31
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR62.1227.3289.44
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR61.2227.3288.54
INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR60.3227.3287.64
IRONWORKER (REINFORCING & STRUCTURAL)57.9434.5292.46
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL52.3117.0169.32
RADIUS MILES FROM THE RESPECTIVE CITY HALL51.5216.9968.51
RADIUS MILES FROM THE RESPECTIVE CITY HALL50.3816.9667.34
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL40.8816.7257.60
PAINTER (BRUSH, ROLLER AND SPRAY)41.2414.7055.94
CEMENT MASON/CONCRETE FINISHER54.1621.2775.43
TRUCK DRIVER: 10 YARD TRUCK24.618.3432.95
TRUCK DRIVER: WATER TRUCK24.368.3032.66
TRUCK DRIVER: DUMP TRUCK22.825.8628.68
PIPEFITTER33.306.5139.81
OPERATOR: ROLLER25.258.2033.45
OPERATOR: MECHANIC25.00—25.00
OPERATOR: BULLDOZER29.26—29.26
LABORER: LANDSCAPE14.67—14.67
FENCE ERECTOR15.00—15.00
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.