Building Published 05/18/2026. 25 classifications. Covers 1 county: Lewis
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION) | 75.37 | 18.82 | 94.19 |
| TILE SETTER | 49.70 | 18.62 | 68.32 |
| BRICKLAYER | 55.34 | 20.05 | 75.39 |
| CARPENTER (INCLUDING FORMWORK AND DRYWALL HANGING) | 63.98 | 19.13 | 83.11 |
| ELECTRICIAN | 65.14 | 26.56 | 91.70 |
| INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | 55.13 | 27.32 | 82.45 |
| 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | 58.89 | 27.32 | 86.21 |
| INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | 59.56 | 27.32 | 86.88 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | 62.99 | 27.32 | 90.31 |
| 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | 62.12 | 27.32 | 89.44 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | 60.32 | 27.32 | 87.64 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | 61.22 | 27.32 | 88.54 |
| RADIUS MILES FROM THE RESPECTIVE CITY HALL | 52.31 | 17.01 | 69.32 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 51.52 | 16.99 | 68.51 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 50.38 | 16.96 | 67.34 |
| PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY) | 41.24 | 14.70 | 55.94 |
| SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) | 42.01 | 20.20 | 62.21 |
| CEMENT MASON/CONCRETE FINISHER | 54.16 | 21.27 | 75.43 |
| PIPEFITTER | 60.72 | 34.15 | 94.87 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | 47.98 | 16.47 | 64.45 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK) | 69.86 | 33.39 | 103.25 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | 23.50 | 6.87 | 30.37 |
| PLUMBER | 35.00 | — | 35.00 |
| PAINTER: SPRAY | 17.80 | 4.18 | 21.98 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 27.94 | — | 27.94 |