Building Published 05/18/2026. 31 classifications. Covers 1 county: Grays Harbor
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION) | 75.37 | 18.82 | 94.19 |
| BRICKLAYER | 55.34 | 20.05 | 75.39 |
| TILE SETTER | 49.70 | 18.62 | 68.32 |
| TILE FINISHER | 40.98 | 18.17 | 59.15 |
| MILLWRIGHT | 55.39 | 22.38 | 77.77 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK) | 63.98 | 19.13 | 83.11 |
| ELECTRICIAN | 65.14 | 26.56 | 91.70 |
| POWER EQUIPMENT OPERATORS: GROUP 1AAA Cranes-over 300 tons, or 300 ft of boom (including jib with attachments) | 63.35 | 27.57 | 90.92 |
| POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS | 55.43 | 27.57 | 83.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS | 59.23 | 27.57 | 86.80 |
| POWER EQUIPMENT OPERATOR: GROUP 2 EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC | 59.88 | 27.57 | 87.45 |
| POWER EQUIPMENT OPERATOR: GROUP 1 EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 | 60.67 | 27.57 | 88.24 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS | 62.47 | 27.57 | 90.04 |
| POWER EQUIPMENT OPERATOR: GROUP 1A LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS | 61.56 | 27.57 | 89.13 |
| RADIUS MILES FROM THE RESPECTIVE CITY HALL | 52.31 | 17.01 | 69.32 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES) ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 51.52 | 16.99 | 68.51 |
| ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | 50.38 | 16.96 | 67.34 |
| GLAZIER | 61.14 | 23.76 | 84.90 |
| PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY AND DRYWALL FINISHING/TAPING) | 41.24 | 14.70 | 55.94 |
| SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) | 42.01 | 20.20 | 62.21 |
| CEMENT MASON/CONCRETE FINISHER | 54.16 | 21.27 | 75.43 |
| PIPEFITTER | 60.72 | 34.15 | 94.87 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | 47.98 | 16.47 | 64.45 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 44.13 | 26.40 | 70.53 |
| SHEET METAL WORKER (HVAC DUCT WORK ONLY) | 69.86 | 33.39 | 103.25 |
| TRUCK DRIVER: DUMP TRUCK | 23.50 | 6.87 | 30.37 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.83 0.00 PLUMBER | 35.00 | — | 35.00 |
| PAINTER: SPRAY | 17.80 | 4.18 | 21.98 |
| PAINTER: DRYWALL FINISHING/TAPING | 29.90 | — | 29.90 |
| OPERATOR: CRANE | 30.40 | — | 30.40 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 27.94 | — | 27.94 |