Building Published 05/18/2026. 28 classifications. Covers 1 county: Grant
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BRICKLAYER | 33.95 | 19.33 | 53.28 |
| TILE SETTER | 29.86 | 13.95 | 43.81 |
| ELECTRICIAN | 46.15 | 26.10 | 72.25 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | 45.36 | 23.40 | 68.76 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | 43.39 | 23.40 | 66.79 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | 43.05 | 23.40 | 66.45 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER) | 42.71 | 23.40 | 66.11 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | 42.51 | 23.40 | 65.91 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | 42.31 | 23.40 | 65.71 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | 41.56 | 23.40 | 64.96 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | 43.40 | 32.77 | 76.17 |
| LABORER, MASON TENDER BRICK | 38.05 | 16.75 | 54.80 |
| LABORER: A-2: GROUP 10 GRADE CHECKER | 43.21 | 16.90 | 60.11 |
| LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER | 40.46 | 16.90 | 57.36 |
| LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER | 40.13 | 16.90 | 57.03 |
| PAINTER (BRUSH & SPRAY ONLY) | 33.95 | 15.65 | 49.60 |
| CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | 40.89 | 18.64 | 59.53 |
| PIPEFITTER | 65.20 | 34.91 | 100.11 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | 35.75 | 14.40 | 50.15 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 44.30 | 28.58 | 72.88 |
| SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | 45.83 | 27.92 | 73.75 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | 23.50 | 6.87 | 30.37 |
| PLUMBER | 35.00 | — | 35.00 |
| PIPE INSULATOR/WRAPPER | 24.21 | 4.07 | 28.28 |
| PAINTER: ROLLER | 22.06 | 2.72 | 24.78 |
| PAINTER: DRYWALL FINISHING/TAPING | 25.17 | 4.41 | 29.58 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 27.94 | — | 27.94 |
| METAL BUILDING ERECTOR | 11.30 | 3.58 | 14.88 |