Highway Published 05/18/2026. 26 classifications. Covers 1 county: Windsor
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER: DISTRIBUTOR TRUCK | 22.32 | — | 22.32 |
| TRUCK DRIVER, INCLUDES ALL AXLES INCLUDING DUMP TRUCKS | 18.60 | 3.58 | 22.18 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 17.42 | 7.11 | 24.53 |
| TRAFFIC CONTROL: FLAGGER | 11.15 | 4.40 | 15.55 |
| OPERATOR: SCREED | 20.78 | 10.07 | 30.85 |
| OPERATOR: ROLLER | 22.55 | 9.48 | 32.03 |
| OPERATOR: POUNDER | 20.70 | 3.78 | 24.48 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 23.09 | 8.53 | 31.62 |
| OPERATOR: MILLING MACHINE | 28.76 | 16.77 | 45.53 |
| OPERATOR: MECHANIC | 20.45 | 4.54 | 24.99 |
| OPERATOR: LOADER | 22.29 | 4.48 | 26.77 |
| OPERATOR: GRADER/BLADE | 20.91 | 5.79 | 26.70 |
| OPERATOR: DRILL | 20.23 | 4.50 | 24.73 |
| OPERATOR: CRANE | 22.48 | 3.00 | 25.48 |
| OPERATOR: BULLDOZER | 20.71 | 0.92 | 21.63 |
| OPERATOR: BROOM/SWEEPER | 19.94 | 6.29 | 26.23 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 21.15 | 12.05 | 33.20 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 22.87 | 3.07 | 25.94 |
| LABORER: COMMON OR GENERAL, INCLUDING ASPHALT RAKING, SHOVELING, SPREADING AND CONCRETE WORK | 16.85 | 3.90 | 20.75 |
| IRONWORKER, STRUCTURAL | 28.97 | 8.72 | 37.69 |
| IRONWORKER, REINFORCING | 21.00 | 4.92 | 25.92 |
| INSTALLER - SIGN | 18.50 | 5.52 | 24.02 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 20.80 | 4.62 | 25.42 |
| ELECTRICIAN | 28.28 | 1.90 | 30.18 |
| CEMENT MASON/CONCRETE FINISHER | 25.34 | — | 25.34 |
| CARPENTER, INCLUDES FORM WORK | 20.46 | 3.65 | 24.11 |