Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

VA20260004 rev 3

Heavy  Published 05/18/2026. 16 classifications. Covers 1 county: Arlington

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
MASON - STONE45.6521.2166.86
FORM WORKER35.8914.4450.33
ELECTRICIAN59.5023.0682.56
POWER EQUIPMENT OPERATOR: LOADER36.3113.2749.58
POWER EQUIPMENT OPERATOR: CRANE39.9918.0558.04
IRONWORKER31.0018.2849.28
LABORER: PIPELAYER34.278.7042.97
CEMENT MASON/CONCRETE FINISHER30.5014.2344.73
PIPEFITTER55.0024.4679.46
TRUCK DRIVER: DUMP TRUCK16.442.8319.27
OPERATOR: BULLDOZER24.42—24.42
OPERATOR: BOBCAT/SKID STEER/SKID LOADER21.373.8325.20
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE26.865.9832.84
LABORER: LANDSCAPE23.002.3225.32
LABORER: COMMON OR GENERAL18.021.3219.34
CARPENTER22.747.8230.56
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.