Highway Published 05/18/2026. 28 classifications. Covers 1 county: Sevier
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| POWER EQUIPMENT OPERATOR (MECHANIC) | 35.45 | 17.64 | 53.09 |
| TRUCK DRIVER: DUMP TRUCK | 22.49 | 1.59 | 24.08 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | 17.14 | 2.79 | 19.93 |
| TRAFFIC CONTROL: FLAGGER | 12.47 | 2.53 | 15.00 |
| OPERATOR: SCREED | 19.89 | 5.45 | 25.34 |
| OPERATOR: ROLLER | 20.23 | 5.61 | 25.84 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 23.43 | 8.13 | 31.56 |
| OPERATOR: OILER | 19.00 | 5.44 | 24.44 |
| OPERATOR: MILLING MACHINE | 26.53 | 6.00 | 32.53 |
| OPERATOR: LOADER | 20.63 | 6.92 | 27.55 |
| OPERATOR: GRADER/BLADE | 23.69 | 5.95 | 29.64 |
| OPERATOR: CONCRETE FINISHING MACHINE | 22.57 | 6.55 | 29.12 |
| OPERATOR: BULLDOZER | 21.77 | 4.40 | 26.17 |
| OPERATOR: BROOM/SWEEPER | 18.29 | 5.65 | 23.94 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 20.05 | 3.31 | 23.36 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 22.10 | 5.97 | 28.07 |
| LABORER: PIPELAYER | 15.52 | 2.79 | 18.31 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 17.03 | 0.36 | 17.39 |
| LABORER: LANDSCAPE | 14.45 | 2.79 | 17.24 |
| LABORER: COMMON OR GENERAL | 19.55 | 6.04 | 25.59 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | 19.88 | 5.71 | 25.59 |
| INSTALLER - SIGN | 18.22 | 2.79 | 21.01 |
| INSTALLER - GUARDRAIL | 17.79 | — | 17.79 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | 16.76 | 1.62 | 18.38 |
| ELECTRICIAN | 26.83 | — | 26.83 |
| CEMENT MASON/CONCRETE FINISHER | 17.36 | 2.04 | 19.40 |
| CARPENTER, INCLUDES FORM WORK | 22.07 | 6.88 | 28.95 |
| TRUCK DRIVER: WATER TRUCK | 29.53 | 14.65 | 44.18 |