Building Published 05/18/2026. 25 classifications. Covers 1 county: Box Elder
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | 31.66 | 13.97 | 45.63 |
| ELECTRICIAN | 41.23 | 17.66 | 58.89 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 31.86 | 15.83 | 47.69 |
| DRYWALL FINISHER/TAPER | 26.00 | 8.78 | 34.78 |
| PLUMBER/PIPEFITTER | 46.10 | 15.83 | 61.93 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 42.17 | 26.63 | 68.80 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | 46.79 | 14.89 | 61.68 |
| TRUCK DRIVER: DUMP TRUCK | 17.74 | 2.66 | 20.40 |
| TILE SETTER | 23.00 | — | 23.00 |
| TILE FINISHER | 13.54 | — | 13.54 |
| ROOFER | 15.62 | — | 15.62 |
| PAINTER (BRUSH, ROLLER AND SPRAY, EXCLUDING DRYWALLING/TAPING) | 15.33 | — | 15.33 |
| OPERATOR: LOADER | 19.34 | — | 19.34 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 16.92 | — | 16.92 |
| LABORER: PIPELAYER | 13.57 | — | 13.57 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 13.87 | 0.14 | 14.01 |
| LABORER: MASON TENDER - BRICK | 16.38 | 1.00 | 17.38 |
| LABORER: IRRIGATION | 9.50 | — | 9.50 |
| LABORER: COMMON OR GENERAL | 13.40 | 1.48 | 14.88 |
| IRONWORKER, STRUCTURAL | 20.21 | 3.22 | 23.43 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 17.76 | 1.83 | 19.59 |
| CEMENT MASON/CONCRETE FINISHER | 16.00 | — | 16.00 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND METAL STUD INSTALLATION) | 20.68 | 5.49 | 26.17 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 21.00 | 3.20 | 24.20 |
| BRICKLAYER | 22.13 | 1.67 | 23.80 |