Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

UT20260022 rev 1

Heavy  Published 05/18/2026. 22 classifications. Covers 1 county: San Juan

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
OPERATOR: POWER EQUIPMENT (3)BACKHOE: EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION30.7816.0946.87
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY22.0311.8833.91
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY35.6817.5753.25
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY20.858.6529.50
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY21.658.6530.30
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY20.858.6529.50
LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY20.598.6529.24
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY20.858.6529.50
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)12.00—12.00
OPERATOR: EXCAVATOR (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)12.75—12.75
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)13.63—13.63
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION)10.89—10.89
OPERATOR: LOADER (FRONT END)11.38—11.38
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION13.61—13.61
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)9.00—9.00
LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)12.00—12.00
LABORER: MASON TENDER - CEMENT/CONCRETE9.000.369.36
CEMENT MASON/CONCRETE FINISHER14.000.5614.56
CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK)14.753.0317.78
PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE46.0215.7561.77
PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE46.6515.7562.40
TRUCK DRIVER: GROUP 3 AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) NATURAL GAS PIPELINE CONSTRUCTION ONLY PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS GROUP 1: LOW BOY AND TRUCK MECHANIC GROUP 2: STRINGER TRUCK41.9015.7557.65
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.