Building Published 05/18/2026. 49 classifications. Covers 1 county: Hays
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | 29.50 | 8.79 | 38.29 |
| BOILERMAKER | 33.17 | 24.92 | 58.09 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 31.52 | 9.20 | 40.72 |
| ELEVATOR MECHANIC FOOTNOTE: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND VETERANS DAY | 51.59 | 38.44 | 90.03 |
| POWER EQUIPMENT OPERATOR (CRANES) | 39.47 | 10.39 | 49.86 |
| IRONWORKER: ORNAMENTAL | 28.26 | 8.13 | 36.39 |
| IRONWORKER, STRUCTURAL | 28.30 | 8.23 | 36.53 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 34.15 | 15.77 | 49.92 |
| HVAC MECHANIC (HVAC UNIT INSTALLATION ONLY) | 37.15 | 16.92 | 54.07 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 38.57 | 24.47 | 63.04 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | 34.01 | 16.10 | 50.11 |
| WATERPROOFER | 16.30 | 0.06 | 16.36 |
| TRUCK DRIVER: WATER TRUCK | 12.00 | 4.11 | 16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: FLATBED TRUCK | 19.65 | 8.57 | 28.22 |
| TRUCK DRIVER: DUMP TRUCK | 12.39 | 1.18 | 13.57 |
| TILE SETTER | 15.38 | — | 15.38 |
| TILE FINISHER | 11.32 | — | 11.32 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 17.84 | 3.26 | 21.10 |
| ROOFER | 12.00 | — | 12.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 21.58 | 2.88 | 24.46 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 18.76 | 6.35 | 25.11 |
| OPERATOR: ROLLER | 11.25 | — | 11.25 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.03 | — | 16.03 |
| OPERATOR: MECHANIC | 18.75 | 5.12 | 23.87 |
| OPERATOR: LOADER | 14.00 | — | 14.00 |
| OPERATOR: GRADER/BLADE | 19.30 | — | 19.30 |
| OPERATOR: FORKLIFT | 15.68 | — | 15.68 |
| OPERATOR: DRILL | 14.50 | — | 14.50 |
| OPERATOR: BULLDOZER | 14.00 | — | 14.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.00 | — | 13.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 19.43 | 3.49 | 22.92 |
| LABORER: ROOF TEAROFF | 11.28 | — | 11.28 |
| LABORER: PIPELAYER | 12.45 | — | 12.45 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 11.85 | — | 11.85 |
| LABORER: MASON TENDER - BRICK | 11.00 | — | 11.00 |
| LABORER: COMMON OR GENERAL | 10.43 | — | 10.43 |
| IRONWORKER, REINFORCING | 12.27 | — | 12.27 |
| GLAZIER | 12.83 | — | 12.83 |
| FLOOR LAYER: CARPET | 21.88 | — | 21.88 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | 24.00 | 3.66 | 27.66 |
| ELECTRICAL INSTALLER (SOUND AND COMMUNICATION SYSTEMS ONLY)EXCLUDES WIRING | 12.50 | 0.65 | 13.15 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 14.00 | — | 14.00 |
| DRYWALL FINISHER/TAPER | 16.96 | 4.34 | 21.30 |
| CEMENT MASON/CONCRETE FINISHER | 15.71 | — | 15.71 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | 13.99 | — | 13.99 |
| CARPENTER (FORM WORK ONLY) | 15.62 | 0.05 | 15.67 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | 14.00 | — | 14.00 |
| BRICKLAYER | 20.86 | — | 20.86 |