Building Published 05/18/2026. 53 classifications. Covers 1 county: Galveston
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | 30.20 | 12.38 | 42.58 |
| BOILERMAKER | 33.17 | 24.92 | 58.09 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | 33.27 | 9.73 | 43.00 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | 35.63 | 14.27 | 49.90 |
| ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY | 53.59 | 38.44 | 92.03 |
| POWER EQUIPMENT OPERATOR (CRANES) | 39.47 | 10.39 | 49.86 |
| IRONWORKER: ORNAMENTAL | 28.26 | 8.13 | 36.39 |
| PAINTER (BRUSH, ROLLER, AND DRYWALL FINISHING/TAPING) | 17.88 | 9.50 | 27.38 |
| PLASTERER | 31.34 | 10.30 | 41.64 |
| PLUMBER | 39.98 | 11.61 | 51.59 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | 42.09 | 12.96 | 55.05 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 29.70 | 13.85 | 43.55 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | 29.70 | 13.85 | 43.55 |
| WATERPROOFER | 14.39 | — | 14.39 |
| TRUCK DRIVER: WATER TRUCK | 12.00 | 4.11 | 16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: FLATBED TRUCK | 19.65 | 8.57 | 28.22 |
| TRUCK DRIVER: DUMP TRUCK | 12.39 | 1.18 | 13.57 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | 14.95 | 5.23 | 20.18 |
| TILE SETTER | 16.17 | — | 16.17 |
| TILE FINISHER | 12.00 | — | 12.00 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 18.62 | 3.03 | 21.65 |
| ROOFER | 15.40 | — | 15.40 |
| PAINTER: SPRAY (EXCLUDES DRYWALL FINISHING/TAPING).$ 17.43 4.43 OPERATOR: ROLLER | 16.00 | — | 16.00 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.03 | — | 16.03 |
| OPERATOR: MECHANIC | 17.52 | 3.33 | 20.85 |
| OPERATOR: LOADER | 13.55 | 0.94 | 14.49 |
| OPERATOR: GRADER/BLADE | 13.37 | — | 13.37 |
| OPERATOR: FORKLIFT | 15.64 | — | 15.64 |
| OPERATOR: DRILL | 16.22 | 0.34 | 16.56 |
| OPERATOR: BULLDOZER | 20.77 | — | 20.77 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.93 | — | 13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 14.10 | — | 14.10 |
| LATHER | 20.11 | — | 20.11 |
| LABORER: LANDSCAPE AND IRRIGATION | 9.49 | — | 9.49 |
| LABORER: ROOF TEAROFF | 11.28 | — | 11.28 |
| LABORER: PIPELAYER | 12.94 | — | 12.94 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 10.50 | — | 10.50 |
| LABORER: MASON TENDER - BRICK | 13.37 | — | 13.37 |
| LABORER: COMMON OR GENERAL | 11.47 | — | 11.47 |
| IRONWORKER, STRUCTURAL | 25.37 | 6.00 | 31.37 |
| IRONWORKER, REINFORCING | 12.10 | — | 12.10 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | 17.40 | — | 17.40 |
| GLAZIER | 17.09 | 3.41 | 20.50 |
| FORM WORKER | 12.07 | — | 12.07 |
| FLOOR LAYER: CARPET | 20.00 | — | 20.00 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 19.23 | 3.55 | 22.78 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | 17.97 | 3.37 | 21.34 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 17.88 | 5.24 | 23.12 |
| CEMENT MASON/CONCRETE FINISHER | 13.82 | — | 13.82 |
| CAULKER | 15.36 | — | 15.36 |
| BRICKLAYER | 19.86 | — | 19.86 |
| ACOUSTICAL CEILING MECHANIC | 16.41 | 3.98 | 20.39 |