Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

TX20260236 rev 1

Building  Published 05/18/2026. 41 classifications. Covers 1 county: Cameron

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
BOILERMAKER33.1724.9258.09
POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER)32.3513.1045.45
POWER EQUIPMENT OPERATOR ((1) TOWER CRANE)32.8513.1045.95
IRONWORKER: ORNAMENTAL28.268.1336.39
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)42.0912.9655.05
TRUCK DRIVER: WATER TRUCK12.004.1116.11
TRUCK DRIVER: SEMI-TRAILER TRUCK12.50—12.50
TRUCK DRIVER: FLATBED TRUCK19.658.5728.22
TRUCK DRIVER: DUMP TRUCK12.391.1813.57
TILE SETTER12.15—12.15
TILE FINISHER11.22—11.22
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.13 6.53 SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)18.402.1220.52
ROOFER11.42—11.42
PLUMBER, EXCLUDES HVAC PIPE INSTALLATION13.59—13.59
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION14.672.5017.17
PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING11.27—11.27
OPERATOR: ROLLER12.70—12.70
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)16.03—16.03
OPERATOR: MECHANIC17.00—17.00
OPERATOR: LOADER12.870.7013.57
OPERATOR: GRADER/BLADE13.07—13.07
OPERATOR: FORKLIFT14.83—14.83
OPERATOR: DRILL16.220.3416.56
OPERATOR: BULLDOZER18.291.3119.60
OPERATOR: BOBCAT/SKID STEER/SKID LOADER13.93—13.93
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE13.15—13.15
LABORER: ROOF TEAROFF10.06—10.06
LABORER: PIPELAYER11.003.4714.47
LABORER: MASON TENDER - CEMENT/CONCRETE10.890.9611.85
LABORER: MASON TENDER - BRICK10.00—10.00
LABORER: COMMON OR GENERAL8.87—8.87
IRONWORKER, STRUCTURAL15.044.3419.38
IRONWORKER, REINFORCING12.01—12.01
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)14.044.7918.83
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING14.000.5414.54
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)13.500.6814.18
DRYWALL HANGER AND METAL STUD INSTALLER19.420.3719.79
DRYWALL FINISHER/TAPER10.752.6813.43
CEMENT MASON/CONCRETE FINISHER12.46—12.46
CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION16.00—16.00
BRICKLAYER16.17—16.17
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.