Building Published 05/18/2026. 40 classifications. Covers 1 county: Brazos
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 33.17 | 24.92 | 58.09 |
| ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY | 53.59 | 38.44 | 92.03 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | 32.35 | 13.10 | 45.45 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | 32.85 | 13.10 | 45.95 |
| IRONWORKER: ORNAMENTAL | 28.26 | 8.13 | 36.39 |
| PLUMBER | 39.98 | 11.61 | 51.59 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | 42.09 | 12.96 | 55.05 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | 37.15 | 16.92 | 54.07 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 29.70 | 13.85 | 43.55 |
| TRUCK DRIVER: WATER TRUCK | 12.00 | 4.11 | 16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: FLATBED TRUCK | 19.65 | 8.57 | 28.22 |
| TRUCK DRIVER: DUMP TRUCK | 11.97 | 1.23 | 13.20 |
| TILE SETTER | 14.74 | — | 14.74 |
| TILE FINISHER | 11.22 | — | 11.22 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 14.62 0.00 ROOFER | 13.75 | — | 13.75 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 13.14 | — | 13.14 |
| OPERATOR: ROLLER | 13.11 | — | 13.11 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.03 | — | 16.03 |
| OPERATOR: MECHANIC | 17.52 | 3.33 | 20.85 |
| OPERATOR: LOADER | 14.01 | 0.44 | 14.45 |
| OPERATOR: GRADER/BLADE | 14.34 | 1.68 | 16.02 |
| OPERATOR: FORKLIFT | 15.00 | — | 15.00 |
| OPERATOR: DRILL | 16.22 | 0.34 | 16.56 |
| OPERATOR: BULLDOZER | 18.29 | 1.31 | 19.60 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.93 | — | 13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 14.33 | — | 14.33 |
| LABORER: ROOF TEAROFF | 11.28 | — | 11.28 |
| LABORER: PIPELAYER | 12.49 | 2.13 | 14.62 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 9.93 | — | 9.93 |
| LABORER: MASON TENDER - BRICK | 10.96 | — | 10.96 |
| LABORER: COMMON OR GENERAL | 11.57 | — | 11.57 |
| IRONWORKER, STRUCTURAL | 20.74 | 5.25 | 25.99 |
| IRONWORKER, REINFORCING | 13.35 | — | 13.35 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 19.77 | 7.13 | 26.90 |
| FORM WORKER | 11.83 | — | 11.83 |
| ELECTRICIAN | 22.96 | 4.83 | 27.79 |
| CEMENT MASON/CONCRETE FINISHER | 14.68 | — | 14.68 |
| CARPENTER, EXCLUDES FORM WORK | 14.56 | — | 14.56 |
| BRICKLAYER | 20.00 | — | 20.00 |