Building Published 05/18/2026. 42 classifications. Covers 1 county: Bell
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| BOILERMAKER | 33.17 | 24.92 | 58.09 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | 32.35 | 13.10 | 45.45 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | 32.85 | 13.10 | 45.95 |
| IRONWORKER: ORNAMENTAL | 28.26 | 8.13 | 36.39 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | 37.15 | 16.92 | 54.07 |
| TRUCK DRIVER: WATER TRUCK | 12.00 | 4.11 | 16.11 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | 12.50 | — | 12.50 |
| TRUCK DRIVER: FLATBED TRUCK | 19.65 | 8.57 | 28.22 |
| TRUCK DRIVER: DUMP TRUCK | 11.50 | 1.10 | 12.60 |
| TILE SETTER | 14.74 | — | 14.74 |
| TILE FINISHER | 11.22 | — | 11.22 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | 15.46 | — | 15.46 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 14.89 1.55 SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | 18.71 | 4.90 | 23.61 |
| ROOFER | 13.75 | — | 13.75 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | 21.18 | 7.57 | 28.75 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | 15.00 | 0.81 | 15.81 |
| OPERATOR: ROLLER | 13.11 | — | 13.11 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | 16.03 | — | 16.03 |
| OPERATOR: MECHANIC | 17.52 | 3.33 | 20.85 |
| OPERATOR: LOADER | 13.88 | 0.44 | 14.32 |
| OPERATOR: GRADER/BLADE | 14.34 | 1.68 | 16.02 |
| OPERATOR: FORKLIFT | 14.00 | — | 14.00 |
| OPERATOR: DRILL | 16.22 | 0.34 | 16.56 |
| OPERATOR: BULLDOZER | 18.29 | 1.31 | 19.60 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | 13.93 | — | 13.93 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | 13.10 | 1.24 | 14.34 |
| LABORER: ROOF TEAROFF | 11.28 | — | 11.28 |
| LABORER: PIPELAYER | 12.49 | 2.13 | 14.62 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | 9.93 | — | 9.93 |
| LABORER: MASON TENDER - BRICK | 9.98 | — | 9.98 |
| LABORER: COMMON OR GENERAL | 10.53 | — | 10.53 |
| IRONWORKER, STRUCTURAL | 18.35 | 4.90 | 23.25 |
| IRONWORKER, REINFORCING | 13.35 | — | 13.35 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | 19.77 | 7.13 | 26.90 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | 16.01 | 1.56 | 17.57 |
| HVAC MECHANIC (HVAC PIPE INSTALLATION ONLY) | 15.50 | — | 15.50 |
| ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING | 20.50 | 2.71 | 23.21 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | 28.28 | 2.44 | 30.72 |
| DRYWALL HANGER AND METAL STUD INSTALLER | 14.59 | — | 14.59 |
| CEMENT MASON/CONCRETE FINISHER | 14.00 | — | 14.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | 17.28 | 1.71 | 18.99 |
| BRICKLAYER | 19.09 | — | 19.09 |