Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

TX20260035 rev 1

Heavy  Published 05/18/2026. 9 classifications. Covers 1 county: El Paso

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
ELECTRICIAN: HEAVY CONSTRUCTION (INCLUDING WATER/SEWER LINES)27.509.3036.80
TRUCK DRIVER9.17—9.17
POWER EQUIPMENT OPERATOR: GRADER11.19—11.19
POWER EQUIPMENT OPERATOR: FRONT END LOADER10.43—10.43
POWER EQUIPMENT OPERATOR: BACKHOE11.57—11.57
LABORERS: (PIPELAYER)8.48—8.48
LABORERS: (COMMON)7.96—7.96
CEMENT MASON/CONCRETE FINISHER9.29—9.29
CARPENTER, INCLUDES FORM WORK12.21—12.21
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.