Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

TX20260018 rev 1

Heavy  Published 05/18/2026. 9 classifications. Covers 6 counties: Collin, Dallas, Denton, Ellis, Kaufman, Rockwall

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
PLUMBERS AND PIPEFITTERS39.7614.0453.80
TRUCK DRIVER8.53—8.53
POWER EQUIPMENT OPERATORS: FRONT END LOADER9.16—9.16
POWER EQUIPMENT OPERATORS: CRANE10.94—10.94
POWER EQUIPMENT OPERATORS: (TUNNELING MACHINE (48"" OR LESS))9.16—9.16
POWER EQUIPMENT OPERATORS: (BACKHOE)10.80—10.80
PIPELAYER7.83—7.83
LABORERS: (UTILITY)7.47—7.47
LABORERS: (COMMON)7.25—7.25
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.