Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

TX20260005 rev 1

Heavy  Published 05/18/2026. 46 classifications. Covers 1 county: Wichita

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
WELDER14.86—14.86
TRUCK DRIVER: SINGLE AXLE13.04—13.04
TRUCK DRIVER: LOWBOY-FLOAT15.00—15.00
TRUCK DRIVER (TRANSIT MIX)14.14—14.14
TRUCK DRIVER (TANDEM AXLE TRACTOR WITH SEMI TRAILER)13.42—13.42
TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP)12.95—12.95
TRUCK DRIVER (OFF ROAD HAULER)12.26—12.26
STEEL WORKER (REINFORCING)16.17—16.17
SERVICER14.74—14.74
POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE17.12—17.12
POWER EQUIPMENT OPERATOR: MECHANIC17.74—17.74
POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR15.72—15.72
POWER EQUIPMENT OPERATOR: (SPREADER BOX)14.71—14.71
POWER EQUIPMENT OPERATOR: (SCRAPER)12.88—12.88
POWER EQUIPMENT OPERATOR: (ROLLER, OTHER)11.82—11.82
POWER EQUIPMENT OPERATOR: (ROLLER ASPHALT)13.29—13.29
POWER EQUIPMENT OPERATOR: (RECLAIMER/PULVERIZER)11.90—11.90
POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE)13.55—13.55
POWER EQUIPMENT OPERATOR: (MOTOR GRADER, ROUGH)16.20—16.20
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)14.29—14.29
POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE)15.68—15.68
POWER EQUIPMENT OPERATOR: (FRONT END LOADER, OVER 3 CY)14.96—14.96
POWER EQUIPMENT OPERATOR: (FRONT END LOADER 3 CY OR LESS)13.85—13.85
POWER EQUIPMENT OPERATOR: (FOUNDATION DRILL, TRUCK MOUNTED)21.51—21.51
POWER EQUIPMENT OPERATOR: (FOUNDATION DRILL, CRAWLER MOUNTED)17.99—17.99
POWER EQUIPMENT OPERATOR: (EXCAVATOR, OVER 50,000 POUNDS)17.04—17.04
POWER EQUIPMENT OPERATOR: (EXCAVATOR, 50,000 POUNDS OR LESS)17.19—17.19
POWER EQUIPMENT OPERATOR: (DIRECTIONAL DRILLING)20.32—20.32
POWER EQUIPMENT OPERATOR: (CRAWLER TRACTOR)14.26—14.26
POWER EQUIPMENT OPERATOR: (CRANE, HYDRAULIC 80 TONS OR LESS)18.22—18.22
POWER EQUIPMENT OPERATOR: (CRANE OPERATOR, LATTICE BOOM OVER 80 TONS)20.52—20.52
POWER EQUIPMENT OPERATOR: (CRANE OPERATOR, LATTICE BOOM 80 TONS OR LESS)17.27—17.27
POWER EQUIPMENT OPERATOR: (CONCRETE SAW)14.67—14.67
POWER EQUIPMENT OPERATOR: (CONCRETE PAVEMENT FINISHING MACHINE)16.05—16.05
POWER EQUIPMENT OPERATOR: (BROOM OR SWEEPER)11.99—11.99
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)13.87—13.87
LABORER: LABORER, COMMON10.51—10.51
LABORER (WORK ZONE BARRICADE SERVICER)11.70—11.70
LABORER (PIPELAYER)13.17—13.17
LABORER (LABORER, UTILITY)12.17—12.17
LABORER (FLAGGER)10.28—10.28
LABORER (ASPHALT RAKER)14.21—14.21
FORM BUILDER/FORM SETTER (STRUCTURES)12.91—12.91
FORM BUILDER/FORM SETTER (PAVING & CURB)11.83—11.83
ELECTRICIAN19.80—19.80
CONCRETE FINISHER (PAVING AND STRUCTURES)12.85—12.85
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.