Highway Published 05/18/2026. 25 classifications. Covers 2 counties: Aiken, Edgefield
| Classification | Base rate | Fringe | Total |
|---|---|---|---|
| TRUCK DRIVER (LOWBOY TRUCK) | 14.11 | — | 14.11 |
| TRUCK DRIVER (DUMP TRUCK) | 12.25 | — | 12.25 |
| POWER EQUIPMENT OPERATOR: (TRACTOR) | 13.28 | — | 13.28 |
| POWER EQUIPMENT OPERATOR: (SCREED) | 13.56 | — | 13.56 |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | 12.71 | — | 12.71 |
| POWER EQUIPMENT OPERATOR: (ROLLER) | 14.09 | — | 14.09 |
| POWER EQUIPMENT OPERATOR: (PAVER) | 13.93 | — | 13.93 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | 11.84 | — | 11.84 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | 15.25 | — | 15.25 |
| POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) | 16.31 | — | 16.31 |
| POWER EQUIPMENT OPERATOR: (HYDROSEEDER) | 11.00 | — | 11.00 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | 17.87 | — | 17.87 |
| POWER EQUIPMENT OPERATOR: (CRANE) | 18.93 | — | 18.93 |
| POWER EQUIPMENT OPERATOR: (BULLDOZER) | 17.38 | — | 17.38 |
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE) | 15.20 | — | 15.20 |
| LABORER (TRAFFIC CONTROL-FLAGGER) | 11.07 | — | 11.07 |
| LABORER (TRAFFIC CONTROL-CONE SETTER) | 10.87 | — | 10.87 |
| LABORER (PIPELAYER) | 14.46 | — | 14.46 |
| LABORER (MASON TENDER-CEMENT/CONCRETE) | 10.40 | — | 10.40 |
| LABORER (LUTEMAN) | 11.61 | — | 11.61 |
| LABORER (COMMON OR GENERAL) | 9.04 | — | 9.04 |
| LABORER (ASPHALT INCLUDES ASPALT DISTRIBUTOR, SHOVELER, AND SPREADER) | 11.54 | — | 11.54 |
| IRONWORKER, REINFORCING | 15.02 | — | 15.02 |
| CEMENT MASON/CONCRETE FINISHER | 13.16 | — | 13.16 |
| CARPENTER (FORM WORK ONLY) | 13.73 | — | 13.73 |