Davis-Bacon Rate Lookupfree · sourced from sam.gov · no sign-up

SC20260034 rev 1

Highway  Published 05/18/2026. 42 classifications. Covers 4 counties: Berkeley, Charleston, Dorchester, Horry

Check that the construction type above matches your contract. A county usually has several determinations and their rates differ. Verify at sam.gov.
ClassificationBase rateFringeTotal
TRUCK DRIVER: LOWBOY TRUCK15.55—15.55
TRUCK DRIVER: DUMP TRUCK10.67—10.67
POWER EQUIPMENT OPERATOR: TRACTOR13.28—13.28
POWER EQUIPMENT OPERATOR: SCREED13.56—13.56
POWER EQUIPMENT OPERATOR: SCRAPER12.71—12.71
POWER EQUIPMENT OPERATOR: PAVER (HORRY)13.29—13.29
POWER EQUIPMENT OPERATOR: PAVER (BERKELEY, CHARLESTON, DORCHESTER)18.85—18.85
POWER EQUIPMENT OPERATOR: MECHANIC (HORRY)19.48—19.48
POWER EQUIPMENT OPERATOR: MECHANIC (CHARLESTON)19.21—19.21
POWER EQUIPMENT OPERATOR: MECHANIC (BERKELEY, DORCHESTER)19.07—19.07
POWER EQUIPMENT OPERATOR: GRADER/BLADE14.61—14.61
POWER EQUIPMENT OPERATOR: CRANE (HORRY)20.58—20.58
POWER EQUIPMENT OPERATOR: CRANE (CHARLESTON)20.08—20.08
POWER EQUIPMENT OPERATOR: CRANE (BERKELEY, DORCHESTER)20.004.7324.73
POWER EQUIPMENT OPERATOR: BULLDOZER14.81—14.81
POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (HORRY)15.04—15.04
POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (DORCHESTER)16.06—16.06
POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (CHARLESTON)16.09—16.09
POWER EQUIPMENT OPERATOR BACKHOE/EXCAVATOR/TRACKHOE (BERKELEY)15.68—15.68
POWER EQUIPMENT OPERATOR: (ROLLER)15.17—15.17
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)11.84—11.84
POWER EQUIPMENT OPERATOR: (LOADER (FRONT END/TRACK))16.80—16.80
POWER EQUIPMENT OPERATOR: (HYDROSEEDER)11.00—11.00
LABORER: PIPELAYER13.98—13.98
LABORER: MASON TENDER-CEMENT/CONCRETE10.40—10.40
LABORER, TRAFFIC CONTROL-CONE SETTER (HORRY)12.63—12.63
LABORER, TRAFFIC CONTROL-CONE SETTER (BERKELEY, CHARLESTON, DORECHESTER)13.19—13.19
LABORER, COMMON OR GENERAL (HORRY)9.72—9.72
LABORER, COMMON OR GENERAL (DORCHESTER)11.69—11.69
LABORER, COMMON OR GENERAL (CHARLESTON)10.16—10.16
LABORER, COMMON OR GENERAL (BERKELEY)10.06—10.06
LABORER, ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, SHOVELER AND SPREADER (HORRY)11.54—11.54
LABORER, ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, RAKER, SHOVELER, AND SPREADER (BERKELEY, CHARLESTON, DORCHESTER)11.62—11.62
LABORER (TRAFFIC CONTROL-FLAGGER)11.07—11.07
LABORER (LUTEMAN)11.61—11.61
IRONWORKER, REINFORCING15.35—15.35
CEMENT MASON/CONCRETE FINISHER (HORRY)14.62—14.62
CEMENT MASON/CONCRETE FINISHER (CHARLESTON)14.33—14.33
CEMENT MASON/CONCRETE FINISHER (BERKELEY, DORCHESTER)14.79—14.79
CARPENTER, FORM WORK ONLY (HORRY)14.29—14.29
CARPENTER, FORM WORK ONLY (CHARLESTON)13.07—13.07
CARPENTER, FORM WORK ONLY (BERKELEY, DORCHESTER)13.50—13.50
Filing the WH-347 that these rates feed into? I build certified payroll tools, and I will prepare your first weekly filing from your payroll register free, with worker names removed — partly to be useful, partly because real registers are the only way to test the thing properly. hamza.aiemployee@gmail.com. No sign-up on this site, and nothing here is tracked.